Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, asbestos abatement, new construction and renovation of an educational facility in Farmington, Connecticut. Completed plans call for the construction of a 239,500-square-foot educational facility.
*As of November 22, 2022, construction is underway. **THE BID DUE DATE OF OCTOBER 6, 2022 @ 2:00 P.M. REMAINS FOR THE FOLLOWING BID PACKAGES: 2.03 - CONCRETE 2.05a - STRUCTURAL STEEL 2.21 - FIRE PROTECTION 2.22a - PLUMBING (NEW HS) 2.23a - HVAC (NEW HS) 2.26 - ELECTRICAL (NEW HS) 2.31 - SITEWORK FARMINGTON HIGH SCHOOL AND FPS CENTRAL OFFICES PROJECT NO PLA, Prevailing Wages apply to this project. This project consists of the construction of a new Farmington High School building and renovations of a portion of the existing high school building for high school athletics and FPS Central Offices. The project includes abatement and demolition of the majority of the existing Farmington High School located on the same property after the new building is complete; followed by renovations, construction of tennis courts and completion of sitework. The Work is defined by two State project numbers: 052-0076N for work associated with the Farmington High School (includes new HS building and portion of renovated building) and 052-0077BE for work associated with the FPS Central Offices (other portion of renovated building). Phase 1 of the Farmington High School project, State Project No. 052-0076N: Early Site Enabling has already been awarded and is currently underway. This phase of work consists of the construction of a temporary bituminous parking lot in the field located adjacent to the Farmington Library, the installation of a temporary pedestrian path, temporary fencing and gates, as well as traffic control signage. These bid documents are specific to Phase 2 of the Farmington High School and Phase 1 of FPS Central Office projects, described as follows: Construction of the new Farmington High School; abatement and demolition of the existing High School, renovations of existing high school building after demo (a portion of this renovation area is the FPS Central Offices project), construction of the tennis courts and completion of all remaining sitework improvements. This project consists of the construction of a new approx. 239,500 SF steel-framed building constructed with typical spread footings, structural steel, fireproofed, with CFMF and/or CMU back up wall structure covered with brick veneer and large curtainwall and storefront, and an EPDM roof to complete the building envelope. All new utility services will provide electrical, gas and water from the street to the building. The new building and all adjacent site improvements for parking and drive access will be constructed beginning in November of 2022 and completed in early August of 2024. Following turnover of the new school building, abatement/demolition and renovations of the existing high school building, and construction of the new tennis courts will commence. Abatement and demolition is scheduled to be complete in November 2024, with all renovation work scheduled for completion in March 2025. Final sitework will extend into May 2025. Bid result BID PACKAGE 2.03 - CONCRETE - MT Ford Industries, Inc. -$3,740,000 BID PACKAGE 2.05a - STRUCTURAL STEEL - United Steel, Inc - $10,657,000 BID PACKAGE 2.21 - FIRE PROTECTION - H.H.S. Mechanical Contractors Inc - $1,472,000 BID PACKAGE 2.22a - PLUMBING (NEW HS) - Ferguson Mechanical Co., Inc - $4,842,000 BID PACKAGE 2.23a - HVAC (NEW HS) - Ferguson Mechanical Co., Inc - $12,617,000 BID PACKAGE 2.26 - ELECTRICAL (NEW HS) - Ferguson Electric Co., Inc. - $8,472,000 BID PACKAGE 2.31 - SITEWORK - J. Iapaluccio, Inc. - $12,565,000
Under Construction
Educational
$54,365,000.00
Public - City
Asbestos Abatement, Demolition, New Construction, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2022
November 14, 2022
10 Monteith Dr, Farmington, CT
Related To This Project
Farmington, CT
Bid Date: Nov 02 2022
Farmington, CT
--
Farmington, CT
--
Farmington, CT
--
Farmington, CT
--
Farmington, CT
Bid Date: Dec 08 2022
Farmington, CT
Bid Date: Nov 17 2022
Farmington, CT
Bid Date: Mar 20 2023
Farmington, CT
Bid Date: Nov 03 2022
Farmington, CT
Bid Date: Oct 12 2022
Farmington, CT
Bid Date: Nov 21 2022
Farmington, CT
Bid Date: Oct 19 2022
Farmington, CT
Bid Date: Nov 09 2022
Middletown, CT
Bid Date: Oct 14 2022
West Hartford, CT
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.