BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Columbus, Georgia. Completed plans call for the renovation of a educational facility.

The work will include all typical construction trades, including mechanical, electric, plumbing, demolition, painting, ceilings, for an area that may include the entire Columbus High School, except the new multi-purpose building; and that may include the entire Hardaway High School. Also, each school will need to be financially separate projects to comply with Ga DOE funding requirements; and Davis-Bacon Act wage requirements will apply since federal funds are being used in this project. The services will consist of pre-construction and construction services which may proceed concurrently. Pre-construction services include cost estimating, constructability analysis and scheduling and phasing of the work. The successful proposer shall serve as the General Contractor and Construction Manager at Risk (CM) for the Project and shall assist the School District and its Project Design Team of Engineers in finalizing the phasing and scheduling of the work and value engineering of the Project. The evaluation factors for the RFP and their relative importance are as follows: Stability of CM (20%), Relative Experience and Qualifications of CM (20%); Quality of Proposed Management Plan (15%); Past Performance of CM (20%); and Fee of CM (25%). Substantial Completion shall occur before December 16, 2023. Since this is a Request for Proposals (RFP), no information will be disclosed prior to the Muscogee County School Board awarding a contract. No proposals may be withdrawn for a period of 45 days after submittal due date and time. This RFP includes General Construction Services for Columbus and Hardaway High Schools HVAC Upgrade Project. The services will be performed by a qualified contractor, hereafter called the Construction Manager (CM). The services will consist of pre-construction services, including cost estimating, constructability analysis, scheduling and phasing, Value Engineering (VE), and construction. The CM will assist the Owner in finalizing the phasing and scheduling of the work. The Construction Budget is: Columbus High School $5,950,000 Hardaway High School $5,600,000 Sealed proposals for general construction services for Columbus High School HVAC Upgrade, located at 1700 Cherokee Avenue, Columbus, GA 31906 and Hardaway High School HVAC Upgrade, located at 2901 College Drive, Columbus, GA 31906

Post-Bid

Educational

$11,550,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
21
Bidding Soon
419
All Active Projects
170
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2022

January 16, 2023

img_map_placeholder

1700 Cherokee Ave, Columbus, GA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.