Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Birmingham, Alabama. Completed plans call for the renovation of a 19,000-square-foot, two-story above grade educational facility.
JEFCOED Kitchen Hood Renovations for Bagley, Gardendale, and McAdory Elementary Schools. The work includes the replacement of the existing Kitchen Exhaust Hood associated exhaust duct and exhaust fan. There will also be new mechanical equipment to provide HVAC to the existing kitchen space. The utility curb for the equipment under the hood will be replaced with a stainless steel prefabricated UDS. A cashier's check or bid bond payable to Jefferson County Board of Education in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. The Owner intends to award multiple or single contracts for this work to pre-qualified General Contractor(s). The Owner will accept proposals only from firms which demonstrate their experience and ability to perform the work necessary for this project. Interested General Contractors must submit a Contractor's Qualification Statement, AIA A305. Minimum qualifications to be certified by prospective bidders include: 1) statutory licensor requirements, 2) bonding capacity in excess of $5,000,000 dollars, 3) minimum of five (5) years successful history as an approved, authorized or licensed General Contractor, 4) successful current experience in construction of a size and scope similar to this Project, and 5) submit list of proposed contractor's team including subcontractors. Joint venture arrangements must qualify solely on the strength of the principal firm's qualifications. Notarized Contractor's Qualification Certificates must be submitted to the Architect along with any request to obtain Bid Documents by a General Contractor by Tuesday, October 11th, 2022. The required Form of Certificate is AIA Document A305 Contractor's Qualification Statement 1986 Edition and may be obtained from the Architect. Bidder's Requests for Information. Send via e-mail to wbradford@turnerbatson.com. All RFI's are to be sent prior to 3 business days of the bid date (October 27th at 2:00 pm). Bids must be submitted on proposal forms furnished by the Architect (Engineer) or copies thereof. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Architect (Engineer); the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interests of the Owner will thereby be promoted. Project No. 22085U02GES
Post-Bid
Educational
$60,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2022
June 1, 2023
Multiple Locations, Birmingham, AL
Related To This Project
Birmingham, AL
Bid Date: Oct 11 2022
Birmingham, AL
Bid Date: Aug 18 2022
Birmingham, AL
Bid Date: Sep 13 2022
Village Creek Water Reclamation Facility Reliability and Biological Improvements - Phase 3 - 4578087
Birmingham, AL
Bid Date: Nov 18 2022
Birmingham, AL
Bid Date: Nov 01 2022
Birmingham, AL
Bid Date: Nov 03 2022
Birmingham, AL
Bid Date: Nov 03 2022
Birmingham, AL
Bid Date: Oct 04 2022
Birmingham, AL
Bid Date: Oct 13 2022
Birmingham, AL
Bid Date: Oct 13 2022
Birmingham, AL
--
Birmingham, AL
Bid Date: Oct 25 2022
Birmingham, AL
Bid Date: Oct 25 2022
Birmingham, AL
Bid Date: Oct 06 2022
Birmingham, AL
Bid Date: Nov 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.