BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Roseville, California. Contact the soliciting agency for additional information.

The City of Roseville, is soliciting proposals for Professional Design Services for Phase 1 and Construction Support Services for Phase 2 of the Environmental Utilities Department's - Utility Operations Center Project. Qualified individuals, firms, contractors, consultants or entities, that meet the requirements set forth in this Request for Proposals, and are capable of providing the services requested are encouraged to participate. The engineering firm or team selected for Phase 1 of this Project will be required to provide equipment, materials, and labor to complete all of the scope of Phase 1 and support services for Phase 2. Tasks for this proposal solicitation are further defined in Section 4.2 - Scope Tasks. Phase 1 of the Utility Operations Center Project will include the following: Conduct field investigations and data collection. Conduct analysis of supplies and demands for utilities. Conduct analysis of RRTO waste streams and projections for future. Prepare Basis of Design Report. Prepare CEQA document. Complete preliminary design of all facilities on the site. Complete final design of RRTO Facilities. Complete final design of site utilities; water, sewer, storm water, and electric. Develop performance specifications for RRTO equipment. Solicit and analyze equipment and installation quotes for RRTO equipment. Prepare construction plans and specifications for construction of the RRTO buildings. Prepare construction documents including a design assist Request for Proposals (RFP) and contract based on City templates. Act as Owners Representative assisting the City in the selection of contractor for the construction of Solid Waste facilities buildings. Manage/oversee the specialty supplier/contractor in the installation of RRTO equipment Provide Engineering Services During Construction and Construction Management services during construction of the RRTO (defined as Phase 2 of the project). Question cut off date is Friday, November 4, 2022 The method of Contractor Selection has not been Determined at this time.

Conceptual

Municipal

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
67
Bidding Soon
1,404
All Active Projects
587
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2023

img_map_placeholder

Multiple Locations, Roseville, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.