BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 9, 2022 at 7:00 PM

Updated April 20, 2024

Site work and paving for a mixed-use development in Altoona, Iowa. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Parking lot resurfacing at NEAR INTERECTION OF 19th STREET SW & 6th AVENUE SW; ALTOONA, IOWA 50009 B. Type of Contract: 1. Project will be constructed under a single prime contract. C. Commencement of Work On-Site: Work may commence on-site on March 1, 2023. 1. Materials for construction may be purchased prior to the commencement of on-site work. D. Project Completion: Sequence the Work to achieve Substantial Completion on or before August 15, 2023. E. Cooperate fully with Owner so work may be carried out smoothly, without interfering with or delaying work under this Contract or work by Owner. Coordinate the Work of this Contract with work performed by Owner. NEAR INTERECTION OF 19th STREET SW & 6th AVENUE SW; ALTOONA, IOWA 50009. Est. Value Notes: Base Bid Value Est. Completion Date: Aug. 15, 2023 Parks, Recreation, Trail Work, Landscaping (Tree and Shrub Clearing), Paving - Concrete, Culverts, Waterways, Stormwater Channels, Construction, Sidewalks/Curbs/Gutters, Concrete/Formed/Flatwork/Foundation, Concrete Walkway, Concrete Pavement, Sawcutting/Sidewalk/Pavement, Traffic Control, Pavement Removal, Landscaping, Stormwater Improvements, Landscaping - Seeding, Erosion Control - Temporary, Paving (Asphalt or Concrete), Box Culvert, Drainage, Precast, Storm Drain and Paving, Removal and Replacement of pipe, Street/Roadway Reconstruction , Sewer and Water Construction, Sitework/Excavating and Grading, Paving (Trail Paving), Grubbing & Clearing, Concrete Pavement Removal, Water Resources Infrastructure, Street/Road Concrete Reconstruction Storm sewer improvements along with associated clearing, grading, pavement removal, repaving, seeding and landscaping NEAR INTERECTION OF 19th STREET SW & 6th AVENUE SW; ALTOONA, IOWA 50009.

Award

Bridges / Tunnels

$2,263,052.00

Public - City

Paving, Site Work

53

21

31

7

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
70
Bidding Soon
1,016
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

March 1, 2023

Project location map

6th Ave SW & 19th St SW, Altoona, IA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.