Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a mixed-use development in Germantown, Wisconsin. Completed plans call for the construction of a 127,000-square-foot municipal facility; for site work for a municipal facility; road / highway; and for paving for a road / highway.
Project Category Code: Plumbing, Heating, Ventilation, Air Conditioning (HVAC), Paving (Asphalt or Concrete), Concrete Pavement, Masonry Construction & Restoration, Fencing/Guardrails/Handrails, Landscaping, Electrical, Buildings Commercial and Private Description: Project includes construction of new DPW building and site concrete, site asphalt, site fencing and landscaping The Project consists of the construction of the relocation of the Village of Germantown DPW Facility as outline below.. 1. The existing Public Works Campus is located at the southwest corner of Fond Du Lac Avenue and Division Road. The campus generally consists of a masonry administration building with four metal storage buildings. In addition, located directly across Division Road at the northwest corner of the intersection, is the Village's salt shed, a storage building and on-site storage. 2. The new site acquired is located at the southwest corner of Donges Bay Road and Wasaukee Road. The proposed DPW facility is approximately 127,000 square feet. It will house all the departments from the existing location, along with a new salt shed, Recycling Center, fueling station, water filling station and on-site storage. Operations from at least three existing separate locations will now be accommodated at this new location. 3. Exterior Construction: The proposed DPW will be constructed of insulated precast concrete wall panels. The roof structure will be long span steel bar joists/metal deck with a single-ply TPO membrane, fully adhered on 4" of polyisocyanurate insulation. All exterior glazing within the thermally broken window systems and overhead doors will be insulated glass. The hollow metal service doors will be insulated with the frames foamed in place. The precast wall panels will be prefinished with accent areas painted. The service doors and entrance canopy will also be painted. All other materials will be prefinished. 4. Interior Construction: The majority of the interior walls are masonry for durability. Masonry walls in the administration areas will be covered with gypsum board. Other masonry walls used for storage areas will be painted. Individual offices will be gypsum board partitions. All door frames will be painted hollow metal. Administration doors will be wood and other doors will be painted hollow metal. Finished administration areas will have a suspended acoustical tile ceilings while all other areas will have an exposed painted structure. Administration areas with a suspended ceiling will also receive carpeting. Almost all other floor areas will be sealed concrete. The mezzanine floor areas will be precast concrete plank with a concrete topping. All interior walls and the roof structure will be painted. Everything else will also be painted unless prefinished. Only the concrete floor slab will be sealed, not painted. Please contact Kathryn Sullivan at 414-477-3662 if you have any questions. Bid Result : #1 CONCRETE - Milis Flatwork (#1 & #10 Packages) - $ 3,293,444.00 #2 MASONRY - Superior - $ 633,800.00 #3 GENERAL TRADES / CARPENTRY & MISC. LABOR & MATERIAL - Selzer-Ornst - $ 1,322,563.00 #4 ALUM. ENTRANCES, STOREFRONTS, WINDOWS - Ackman Glass - $ 142,160.00 #5 FIRE PROTECTION - SPRINKLER SYSTEM - DBFP - $ 277,600.00 #6 PLUMBING - Mid-City Plumbing - $ 998,980.00 #7 HVAC - Martin Petersen Company - $ 1,581,000.00 #8 ELECTRICAL, COMMUNICATIONS, ELECTRONIC SAFETY & SECURITY - Steiner Electric - $ 1,623,977.00 #9 ASPHALT PAVING, SEAL COATING, SEALANTS, STRIPPING, SIGNAGE - Payne & Dolan - $ 296,045.00 #10 SITE CONCRETE, C&G - Zignego Concrete - $ 1,417,999 #11 FENCING - Northway - $ 283,800.00 #12 LANDSCAPING - Property Solutions - $ 228,800.00
Bid Results
Municipal
$12,100,168.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 2, 2022
January 2, 2023
Multiple Locations, Germantown, WI
Related To This Project
Germantown, WI
--
Germantown, WI
Bid Date: Nov 08 2022
Germantown, WI
Bid Date: Feb 14 2023
Germantown, WI
--
Germantown, WI
Bid Date: Jun 29 2020
Germantown, WI
Bid Date: Feb 01 2021
Germantown, WI
Bid Date: Oct 08 2019
Larsen, WI
Bid Date: Oct 21 2022
Milwaukee, WI
Bid Date: Nov 03 2022
Madison, WI
Bid Date: Mar 02 2022
Madison, WI
Bid Date: Oct 20 2022
Fond du Lac, WI
Bid Date: Nov 09 2022
Deforest, WI
--
Madison, WI
Bid Date: Aug 25 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.