EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 4, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Bradley, Illinois. Completed plans call for the renovation of a educational facility.

For HVAC Upgrades - Bradley East Elementary School, West Elementary School Forms: 1.The Bid Form used shall be that provided as a part of the Bid Documents. Classifications: 1.Bids shall be submitted according to the following classification: a.Bid No. 1) General Work (to include all work) Bond: 1.Each Bid must be accompanied by a Bid Bond, equal to 5% of the Bid, binding the Bidder to enter into contract. Bid Bonds must be from a surety approved by the owner and licensed in the State of Illinois. 2.Bid Bonds will not be returned. Time: 1.No Bid shall be withdrawn for a period of thirty (30) days after the bid opening date without the consent of the Owner. The successful Bidder(s) shall provide a Performance and Payment Bond for the full amount of their Contract. See Section 00 42 15 - Supplementary General Conditions. Wages: The Wages of Employees on Public Works (Prevailing Wage Act), Illinois Revised Statutes, Chapter 48, Section 39s-1 et seq., shall apply in full to all portions of the work. Procedures: 1.The Owner reserves the right to reject any or all bids, and to waive informalities in bidding. Board of Education Bradley Elementary School District No. 61 111 N. Croswell Bradley, IL 60915 Supply all labor, transportation, apparatus, scaffolding and tools necessary for the completion of the Work; maintain and remove temporary equipment and construct in excellent and workmanlike manner the complete Work and everything properly incidental thereto, as stated in the Contract Documents or reasonably implied therefrom. It is not the intent of the Contract Documents to set forth in detail every item necessary for the construction of this Project. Contractor must be qualified for this work and must, without direction, furnish and install everything necessary to provide construction complete and in acceptable order, ready for use without additional work. All parts must be coordinated, complete, ready to operate and delivered to Owner in new condition. B. This Project is the HVAC Upgrades for Bradley Elementary School District No. 61 at the following school: Bradley East Elementary School, 610 E. Liberty St., Bradley, IL Bradley West Elementary School, 200 State St., Bradley, IL

Award

Educational

$1,267,770.00

Public - City

Renovation

56

14

22

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 05 - Metals

Division 05 - Metals

Metal Decking
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Fire and Smoke Protection, Firestopping, Joint Protection
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Ceilings, Acoustical Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
295
Active Projects
174
Bidding Soon
2,038
All Active Projects
981
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2022

June 5, 2023

img_map_placeholder

Multiple Locations, Bradley, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

HVAC Upgrades - Bradley School District No. 61

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.