Site work for a civil project in Laredo, Texas. Completed plans call for site work for a water / sewer project.

QUESTIONS: Due by Wednesday 5:00 PM, August 30, 2023. Submit all questions on CivCast. Water Plant in Laredo, Texas Work covered by these Technical Specifications is entitled 'Water Plant No. 1, Phase 1 for Gateway MUD No.1, Webb County, Texas.' Description of Work: a. Under this Contract, Contractor shall furnish all materials, appliances, tools, equipment, transportation, services, and all labor and superintendence necessary for the construction of the Work as described in these Technical Specifications and as shown on the Plans. The completed installation shall not lack any part that can be implied as necessary to its proper functioning or any subsidiary item that is customarily furnished, and the Contractor shall deliver the installation to Owner in operating condition. b. The Work, in general, under this Contract includes the purchase, installation, and construction of all structures, equipment, and materials, including appurtenances, as indicated on the Plans. Major items of construction and services required are designated as follows: (1) Construct Water Plant No. 1 including all site work necessary for water plant construction, fill compacted to grade, two 252,302-gallon ground storage tanks, 6,000-gallon hydro-pneumatic tank, one 400 gpm, one 700 gpm, and two 1,400 gpm booster pumps, chlorination system, electrical and instrumentation with building and fencing for a fully operational plant. (2) Furnish and install all appurtenances and systems necessary for a fully operational plant. (3) Perform testing as specified on installed lines. (4) Clean-up project area upon completion. The Work, which shall include the furnishing of all material, equipment, labor, and supervision necessary or incidental for the construction of Water Plant No. 1, Phase 1 for Gateway MUD No. 1. The Project includes all site work necessary for water plant construction, including but not necessarily limited to fill and grading, two 252,302-gallon ground storage tanks, 6,000-gallon hydro-pneumatic tank, one 400-gpm jockey pump with VFD, one 700-gpm booster pump with VFD, two 1,400 gpm booster pumps with soft start, chlorination system, electrical and instrumentation with building, fencing including all appurtenances and systems for a fully operational plant

Bid Results

Water / Sewer

$4,876,211.00

Public - City

Site Work

41

35

20

10

Subscribe For Documents

131 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Decking, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Vapor Retarders, Membrane Roofing, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Joint Protection, Preformed Joint Seals, Backer Rods
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Coiling Doors and Grilles, Panel Doors, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs, Residential Furniture, Beds
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Sanitary Sewerage, Sanitary Waste and Vent Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Embankments, Shoring and Underpinning, Shoring, Sheet Piling, Concrete Raising, Pressure Grouting, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping, Specialty and High-Purity Gases Piping, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment, Gas and Liquid Storage, Gas and Liquid Storage Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
6
Bidding Soon
111
All Active Projects
43
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2023

November 20, 2023

img_map_placeholder

Multiple Locations, Laredo, TX


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Gateway MUD No.1 Water Plant No.1, Phase 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.