Site work and paving for a road / highway in Quartzsite, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.
As of December 13, 2022, project was awarded to CACTUS ASPHALT, awarded amount is $725,237.55. The Town of Quartzsite seeks the preparation, placement, and construction of an ASPHALT OVERLAY on Riggles Avenue and on KUEHN Street at the locations and to the extents set forth in the Bid/Contract Documents for the Project ( Services ). The Services shall conform to Maricopa Association of Governments Standard Specifications unless otherwise directed by the Town's Director of Public Works. The project includes culvert improvements, asphalt milling, tack coat, paving fabric, ASPHALT OVERLAY, shouldering, pavement striping, and other related items of work. The term of the contract will commence upon issuance of a Notice to Proceed and be completed within 45 calendar days. Asphalt Mill, Overlay, and Related Improvements Construction Each bid will be in accordance with the bid requirements set forth in the Bid/Contract Documents, which may be obtained by contacting the Town Clerk and Nicole Collier at the Public Works Department as set forth above. Any bid that does not conform in all material respects to the requirements for bids set forth in the Bid/Contract documents will be considered nonresponsive. The Town of Quartzsite reserves the right to reject any or all bids, waive any informality in a bid, and/or to withhold the award for any reason that the Town of Quartzsite deems appropriate. Equal Opportunity: The Town of Quartzsite is an equal opportunity employer. Minority and women's business enterprises are encouraged to submit bids on this solicitation. Riggles Avenue Conditions 2-lane asphalt roadway with 1 through lane in each direction. Acceleration/deceleration lanes at G Row and Drive to south. Several segments of shoulder pavement areas. The existing asphalt has an average thickness of 4.0-inches. The existing aggregate base material has an average thickness of 3.5-inches. Low to medium severity alligator (fatigue) cracking and low to medium severity transverse cracking were observed along a majority of the road. Medium severity alligator cracking was more common closer to Kuehn Street. Kuehn Street Conditions 2-lane asphalt roadway with 1 through lane in each direction. Pavement widens to a 3-lane section at the west end intersection with Central Blvd (US 95). Four segments of shoulder pavement areas for overflow drainage erosion protection purposes. The existing asphalt ranges from 1.00" thickness to 4.25" thickness with has an average thickness of 3.0-inches. The existing aggregate base material ranges from 3.5" thickness to 7.5" thickness with an average thickness of 5.0-inches. Medium to high severity alligator (fatigue) cracking and some potholes were observed starting at Central Boulevard and extending approximately one-third of a mile east. It appears that some of the potholes have been patched. Low to medium severity alligator cracking with some patched potholes were observed along the remainder of Kuehn Street. Isolated zones of low to medium severity block cracking and transverse cracking were observed. Medium to high severity alligator (fatigue) cracking and some potholes were observed in the intersection of Kuehn Street and Riggles Avenue.
Award
Roads / Highways
$725,238.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 25, 2022
December 5, 2022
Kuehn St & Riggles Ave, Quartzsite, AZ
Related To This Project
Quartzsite, AZ
Bid Date: Apr 26 2022
Quartzsite, AZ
Bid Date: Aug 18 2022
Quartzsite, AZ
Bid Date: Aug 03 2022
Quartzsite, AZ
Bid Date: Jul 06 2022
Quartzsite, AZ
Bid Date: Nov 15 2023
Quartzsite, AZ
Bid Date: Nov 13 2024
Quartzsite, AZ
Bid Date: Feb 29 2024
Marana, AZ
Bid Date: Nov 02 2022
Sierra Vista, AZ
Bid Date: Nov 02 2022
Cottonwood, AZ
Bid Date: Nov 14 2022
Guadalupe, AZ
Bid Date: Nov 03 2022
Tempe, AZ
Bid Date: Oct 18 2022
Tempe, AZ
Bid Date: Oct 18 2022
Goodyear, AZ
Bid Date: Oct 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.