EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 31, 2022 at 8:00 PM

Updated January 26, 2024

Renovation of a water / sewer project in Hopkins, Minnesota. Completed plans call for the renovation of a water / sewer project.

A sign-up sheet will be available at the conference and all attendees' names/signatures will be recorded. Attendance at the Pre-Bid Conference is mandatory to submit a bid for the project. Water Treatment Plant 14 Generator: The major elements of work associated with the WTP 14 generator addition project including, but not limited to: o New electrical generator for backup power for WTP 14. o New automatic transfer switch. o New concrete pad beneath generator o New cable, conduit, and wiring modifications required for generator installation. Each proposal must have with it a bid guarantee in the amount of of the bid, submitted in the form as required by section 1200 of the General Requirements and Covenants in the Bidding Documents, as a guarantee the bidder will enter into a contract with the city of Minnetonka in accordance with the terms of the bid, in case the bidder is awarded the contract. A sign-up sheet will be available at the conference and all attendees' names/signatures will be recorded. Attendance at the Pre-Bid Conference is mandatory to submit a bid for the project. Direct inquiries Engineer, Advanced Engineering and Environmental Services, LLC (AE2S), 6901 East Fish Lake Road, Suite 184, Maple Grove, MN 55369, 763-463-5036. No questions will be answered within 48 hours of bid opening. The city reserves the right to accept or reject any or all bids and to waive minor irregularities. Copies of the plans and project manuals may also be examined at the office of the Public Works Director, 11522 Minnetonka Boulevard, Minnetonka, MN.

Post-Bid

Water / Sewer

$440,000.00

Public - City

Renovation

9

13

2

7

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Shop Drawings, Product Data, and Samples, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, First Aid Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Louvers and Vents, Vents
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Dewatering, Fill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
51
Bidding Soon
1,017
All Active Projects
397
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

WTP 14 Generator Addition Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.