BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a water / sewer project in Crescent City, California. Working plans call for the renovation of a water / sewer project.

***As of October 24, 2022. Bid is cancelled. City of Crescent City Wastewater Treatment Facility (WWTF) Influent Gate Project Description The WWTF is located at 210 Battery Street in the City of Crescent City in Del Norte County of the state of California. The current influent gate is original to the plant circa 1950's. This gate is at the end of its useful life and needs to be replaced. The proposed project will encompass demolition and removal of the existing gate, hydraulic actuator, and float control system. The new influent gate will bolt to the existing influent pipe and a new electric actuator motor will be installed. New electrical work is required for power, control, and monitoring of the new gate. The gate position and actuator control will be integrated into the plant's System Control And Data Acquisition (SCADA) system. The contractor will be required to coordinate start up and testing with the City's SCADA integrator. The City's integrator will only provide programing. The contractor is responsible for providing a complete and functional influent gate system. All work and schedules must be coordinated with the City's WWTF contract operator (Jacobs). Continuous operation of the WWTF is required during the installation. Temporary shutdowns must be coordinated with plant staff. Inspections of the plant prior to bidding must be coordinated with Austin Nova (707) 954- 0713. No formal pre-bid meeting will be held. Direct all questions and requests for information to James Wang 2525 Airpark Drive Redding, CA 96001 (530) 229-3423 james.wang@jacobs.com and Andrew Leighton 377 J Street Crescent City, CA 95531 (707) 458-8617 aleighton@crescentcity.org

Final Planning

Water / Sewer

$76,400.00

Public - City

Renovation

12

3

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
3
Bidding Soon
65
All Active Projects
21
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2022

April 25, 2023

img_map_placeholder

210 Battery St, Crescent City, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.