Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a mixed-use development in Frazer, Montana. Working plans call for site work for a clubhouse / community center; pre-engineered storage facility; and water / sewer project.
For the construction of Frazer Community Hall Foundation project All Bids Rejected . Base Bid: a. The work generally consists of: SCHEDULE 1: POPLAR DEVELOPMENT The work of this schedule generally consists of construction of a concrete foundation, underground sewer and water, and concrete slab construction for the future construction of a 80'x120' pre-engineered steel building. The contract may be awarded based on the OWNER's best interests. The award will be based on the lowest cost combination of responsive, responsible bids, on the Base Bid and various Schedules, Alternatives, and Additive Alternate, as applicable, selected by the OWNER. Contract Time: 1. Base Bid: a. All construction schedules shall be substantially complete and ready for OWNER's use and pre-final inspection within 60 calendar days from the Notice to Proceed, or by Tuesday, January 17, 2023, whichever is sooner. 2. All construction schedules shall be finally complete and ready for final payment within (30) calendar days of Substantial Completion. Liquidated Damages: 1. The CONTRACTOR shall pay the OWNER $2,500, for each calendar day or part of a day that expires after the time specified for Substantial Completion of any construction schedule(s) until the Work is substantially complete. Forms for registration are available from the Department of Labor and Industry at P.O. Box 8011, 1805 Prospect Avenue, Helena, Montana 59604-8011. Information on registration can be obtained by calling 1-406-444-7734. CONTRACTOR is required to have registered with the DLI prior to bidding on this project and all laborers and mechanics employed by the CONTRACTOR or Subcontractors in performance of the construction work shall be paid wages at rates as required by the Laws of the State the work is being performed. The CONTRACTOR must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. Each bid or proposal must be accompanied by a certified check, cashier's check, or bid bond payable to the OWNER, in an amount not less than ten percent (10%) of the total amount of the bid. Successful bidders shall furnish an approved Performance Bond and a labor and materials Payment Bond, each in the amount of one hundred percent (100%) of the contract amount. Insurance, as required, shall be provided by the successful bidder(s) and a certificate(s) of that insurance shall be provided. The bid bond, a copy of the CONTRACTOR's license or certificate of renewal, and applicable funding requirement forms shall be included with each bid of proposal. All bids must be sealed. Funding agency notice, if applicable: 1. Reserved The following additional information, if applicable, shall be submitted in the CONTRACTOR's bid proposal unless otherwise specified: 1. Reserved Pre-bid conference information: 1. There will not be a pre-bid conference. (PRSP) No bid will be read or considered which does not fully comply with the above provisions as to Bond and Licenses, and any deficient bid submitted will be resealed and returned to the Bidder immediately. The OWNER reserves the right to hold all bids and bid securities for a period not to exceed thirty (30) days and to hold the three low bids and bid securities for a period not to exceed sixty (60) days from the date of the bid opening. The OWNER may, in its sole discretion, release any Bid and return the Bid security prior to the end of these periods, waive any informality in any bid, and to reject the bid of any party who has been delinquent or unfaithful in the performance of any former contract with the OWNER
Final Planning
Clubhouse / Community Centers
$250,000.00
Public - Federal
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 27, 2022
January 17, 2023
To Be Determined, Frazer, MT
Related To This Project
Frazer, MT
Bid Date: Aug 25 2022
Frazer, MT
Bid Date: Apr 12 2023
Frazer, MT
Bid Date: May 28 2024
Roy, MT
Bid Date: Dec 12 2022
Billings, MT
Bid Date: Sep 22 2022
Helena, MT
Bid Date: Sep 22 2022
Havre, MT
Bid Date: Sep 22 2022
Fort Peck, MT
Bid Date: Oct 20 2022
Shelby, MT
Bid Date: Oct 27 2022
Helena, MT
Bid Date: Nov 17 2022
Billings, MT
Bid Date: Nov 04 2022
Missoula, MT
Bid Date: Oct 28 2024
Bozeman, MT
Bid Date: Oct 19 2022
Great Falls, MT
Bid Date: Oct 19 2022
Butte, MT
Bid Date: Oct 19 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.