BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Barrington, Illinois. Contact the soliciting agency for additional information.

INVITATION TO BID FOR Barrington Community Unit School District 220 2023 Rejuvenator Pavement Maintenance Barrington, Illinois 2. AVAILABILITY OF CONTRACT DOCUMENTS: On October 10, 2022 after 9:00 A.M., Bid Packets may be obtained from the Engineer's website. This link will take Bidders to the Gewalt Hamilton Associates landing page and will display all available projects. The download cost for this project is $20.00. Please contact at 952-233- 1632 or info@questcdn.com for assistance in free membership registration, downloading, and working with this digital information. Hard copies of the bid documents may also be viewed at no cost or obtained for a non-refundable fee of $150 at Gewalt Hamilton Associates, Inc., 625 Forest Edge Drive, Vernon Hills, Illinois, 60061 (847-478-9700). 3. PREQUALIFICATION OF BIDDERS: All bidders will submit along with their respective bid documents, a resume of similar projects performed, enumerated as to location, type of work, approximate completion date, and project engineering firm. Additionally, all bidders will submit a list of equipment owned by, or available to them, for the efficient pursuance of the project. 4. PROGRESS SCHEDULE: All bidders will submit along with their respective bid documents, a satisfactory progress schedule or critical path schedule which shall show the proposed sequence of work, and how the Contractor proposes to complete the various items of work on or before the completion date specified. Contractor shall work around the individual summer school schedules provided on the plans and listed in the special provisions. Failure to provide a satisfactory progress schedule in the bid package will, at the discretion of the District, be disqualified. 5. WAGES OF EMPLOYEES: Not less than the prevailing rate of wages as found by the Department of Labor or determined by a court on review shall be paid to all laborers, workers and mechanics performing work under this contract. Certified payroll documentation of general contractor's and all sub-contractors' laborers will be required. 6. REJECTION OF BIDS: The Owner reserves the right to reject any and all bids and bidders and to waive technicalities. 7. LOCATION OF THE WORK: Administration Building, Countryside Elementary School, and Roslyn Road Elementary School under School District 220 authority within the Villages of Barrington and Barrington Hills found in Cook, and Lake County. 8. DESCRIPTION OF WORK: Project will include but not limited to: Rejuvenator material to existing asphalt. This project is to be bid as a lump sum contract with supplemental unit prices. 9. BID SECURITY: Bid security in the form of a Bid Bond or Certified Check for ten percent (10%) of the base bid made payable to the Barrington Community Unit School District 220 shall accompany the bid. 10.OWNER: Barrington Community Unit School District 220, 515 W. Main Street, Barrington, IL 60010. 11.CONSTRUCTION SCHEDULE: All Rejuvenator work shall be completed during the weekend (starting Friday and re-opening parking lot Sunday night). The Contractor shall begin the work to be performed under the contract after Thursday, June 8, 2023. The Contractor shall be substantially complete by Friday, August 4, 2023 and final completion by Friday, August 11, 2023. Substantial Completion is defined as all improvements except restoration. Final completion is defined as restoration and punch list items. In case of failure to complete the work on time, liquidated damages shall be assessed in accordance with Article 108.09 of the Standard Specifications or other applicable BDE Special Provisions shall apply. Note: A second site contractor maybe be present at all 3 sites, therefore a one (1) week notice will be required prior to the rejuvenator work being installed. School District recommends that his work occur on the Friday of the Juneteenth Holiday weekend to provide adequate cure time, subject to weather, but the work may occur on any weekend as coordinated with the construction schedule.

Post-Bid

Roads / Highways

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
101
Bidding Soon
2,119
All Active Projects
913
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2022

June 8, 2023

img_map_placeholder

Multiple Locations, Barrington, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.