BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Holladay Cottonwood, Utah. Completed plans call for the renovation of a educational facility.

Granite School District (GSD) is requesting the services of a General Contractor (B100) to perform an Auditorium Lighting Renovation at Bonneville Junior High School, 5330 Gurene Drive (1660 East), Holladay, Utah. Work shall include, but is not limited to: Remove and replace existing floor pockets on stage as directed on drawings. Remove, and replace with new, Auditorium ceiling fixtures Remove, and replace with new, step light fixtures. Remove, and replace with new, existing control station. Remove existing dimming rack and replace with new relay panel. Repair ceiling as required from removal of fixtures/devices and finish to match existing. Install GSD-supplied trim panels at all light fixture locations. (Allowance provided) Other work as indicated in the drawings and specifications Questions Due Date. Questions must be submitted by Monday, February 27, 2023 at 2:00 PM. All questions must be submitted via the Utah Public Procurement Place (U3P). Contractor is responsible for reviewing the responses to any questions posted to U3P and acknowledges that all responses become an integral part of the bid package and project requirements. BID BOND. Bidders will be required to provide bid security in an amount equal to at least 5% of the bid amount, at the time the bid is submitted, if the total bid amount for any job is $50,000 or greater. A full one hundred percent (100%) performance bond in the amount of the Preconstruction Compensation covering the faithful execution of the Preconstruction Work in accordance with the Contract Documents; A full one hundred percent (100%) performance bond in the amount of the Contract Price covering the faithful execution of the Construction Phase Work in accordance with the Contract Documents; A full one hundred percent (100%) payment bond in the amount of the Contract Price covering payment of all obligations relating to the Construction Phase Work arising under the Contract Documents, for the protection of each person supplying labor, service, equipment, or material for the performance of the Preconstruction Work

Award

Theaters / Auditoriums

$281,529.00

Public - County

Renovation

10

10

4

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
32
Bidding Soon
533
All Active Projects
197
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2023

April 17, 2023

img_map_placeholder

5330 Gurene Dr, Holladay Cottonwood, UT

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.