BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Sinton, Texas. Completed plans call for the renovation of a municipal facility; and 92,000-square-foot, three-story above grade municipal facility.

As of February 29, 2024, both phases are under construction and both phases have already bid. Estimated budget cost: Phase I - Courts Annex Building: $51,000,000.00 Phase II - Courthouse Renovation: $19,000,000.00 LOCATION AND DESCRIPTION OF PROJECT The project is divided into two phases of construction. In Phase l, a new Courts Annex Building will be constructed to move the Judicial Courts and other associated departments for the County out of the existing Courthouse. Phase Il will consist of a complete renovation of the existing Courthouse to reconfigure it's use for the County's Administrative Departments that will remain at the building. Phase I The San Patricio County Courts Annex Building will be located within new development on the east side of Sinton, south of E. Sinton St. and west of Highway 181. The proposed building will be an approximately 92,000 square feet, three story building containing the three District Courts for the County and the County Court at Law. Facilities for the District Attorney, County Attorney, District Clerk, and County Clerk departments are also to be housed in the building. Phase Il The existing San Patricio County Courthouse Building is located at 400 W. Sinton St., Sinton, TX. The original building was constructed in 1926 with maior additions added in 1953 and 1995 with a current total building area of approximately 49,000 square feet. The renovation will include demolition of most of the building back to the existing structure in order to reconfigure it for the County Administration departments that will be housed in the building. An approximately 9,400 square foot addition is proposed to the front entry of the building to facilitate accessible entry including lobby, elevator, stair and public restroom core for each floor. Question Deadline 10/31/2022 at 4:00 PM CT Questions regarding this project should be EMAILED to: Justin Dreyer BRW Architects jdreyer@brwarch.com Phase I - Courts Annex Building - FULTON COASTCON GENERAL CONTRACTORS -$2,293,808.00 Phase II - Courthouse Renovation - SPAWGLASS - $940,086.74

Under Construction

Municipal

$3,233,895.00

Public - County

Renovation

11

5

2

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
14
Bidding Soon
225
All Active Projects
89
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.