Published November 29, 2022 at 7:00 PM
Updated March 4, 2025
Demolition and site work for a medical facility in Fort Wayne, Indiana. Completed plans call for the demolition of a 310,000-square-foot medical facility; and for site work for a medical facility.
Complete demolition to the former Byron Health Center building approximately 213,000 sf and complete demolition to the Kidder Building approximately 97,000 sf The base bid scope is as follows: 1. Contractor is to furnish all labor, materials, and equipment necessary for the complete demolition and removal of the Byron and Kidder Buildings and Foundations, site hardscapes, and utilities as shown on the contract drawings. 2. Dumpsters for disposal of all demolition debris are to be included in the base bid and provided by this contract. a. Absolutely no burning or burying of materials is permitted. 3. Recycling of metal scrap is at the discretion of the awarded contractor. Any Funds received from the recycling efforts are the awarded contractor's to keep. 4. Contractor should include in the base bid all street cleaning and maintenance of the streets surrounding the property through the duration of the project. 5. Contractor should include in the base bid daily cleanup and consolidation of stockpiles of demolished material on the site. 6. Contractor is responsible for temporary toilets as required by OSHA and should be included in the base bid for the duration of the project. 7. Contractor is responsible for temporary power, as the power has been shut off to the buildings. All costs for power required by this contract should be included in the base bid. 8. Contractor is responsible for temporary water as the water has been shut off to the buildings. All costs for water required by this contract should be included in the base bid. 9. Contractor is responsible for all fire protection measures necessary and as required by OSHA. 10. The drawings indicate backfilling and compaction of the buildings footprint upon foundation demolition. This contract is responsible for all sourcing, importing, backfilling, compacting, of all fill material to the grades as indicated on the drawings. Sturges Development has a potential source for backfill materials relatively close to the project site and can provide the geotechnical reports for the source materials upon inquiry. a. No borrow pits will be allowed onsite 11. Contractor is required to coordinate and schedule the Owner's Geotechnical Representative to observe and test all backfill operations. See specifications for testing frequency requirements.
Award
Medical
$2,317,150.00
Public - County
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 1, 2022
November 18, 2022
2260 Carroll Rd, Fort Wayne, IN
Related To This Project
Fort Wayne, IN
Bid Date: Feb 14 2023
Fort Wayne, IN
Bid Date: Nov 17 2022
Fort Wayne, IN
Bid Date: Nov 10 2022
Fort Wayne, IN
Bid Date: Nov 28 2022
Fort Wayne, IN
Bid Date: Nov 15 2022
Fort Wayne, IN
Bid Date: Oct 20 2022
Fort Wayne, IN
Bid Date: Aug 02 2022
Fort Wayne, IN
Bid Date: Oct 27 2022
Fort Wayne, IN
Bid Date: Oct 27 2022
Fort Wayne, IN
Bid Date: Dec 01 2022
Fort Wayne, IN
Bid Date: Dec 07 2022
Fort Wayne, IN
Bid Date: Nov 21 2022
Fort Wayne, IN
Bid Date: Nov 03 2022
Fort Wayne, IN
Bid Date: Oct 18 2022
Fort Wayne, IN
Bid Date: Nov 10 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.