EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 2, 2022 at 7:00 PM

Updated October 1, 2024

Site work, paving and outdoor lighting for a mixed-use development in Middletown, Pennsylvania. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

CLARIFICATION DEADLINE 11/2/2022 5:00 PM to 11/7/2022 at 5:00 PM. The work site is located at Harrisburg International Airport in Middletown, Pennsylvania. Contractor shall complete all Work as specified or indicated in the Contract Documents. The work is generally described as follows: The work is to include all labor, material, tools, equipment, insurances, taxes, engineering, materials handling and transport required for Intersection Improvements including pavement demolition and reconstruction, drainage, utilities, curb and gutter, sidewalk, lighting, signage, pavement markings and other miscellaneous items as indicated in the contract documents. Also included are all temporary measures required to perform the work including but not limited to erosion control, road maintenance, dust control, maintenance of traffic and protection of existing structures. There will be backfilling, grading, seeding and mulching required. Intersection Improvements for Airport Drive, Olmsted Drive, and Third Street. Work is divided into Parts A and B. Part A - This work includes site work, excavation, utilities, drainage, grading, and preparation of aggregate base. Part B - This work includes paving, marking, signage, sidewalks, topsoil, and seeding. No Bidder may withdraw his bid within 60 days after the actual date of the opening thereof unless award is delayed due to the required approval of another government agency, the sale of bonds, or the award of grant or grants; in which case, bids shall be irrevocable for one hundred twenty (120) calendar days in compliance with Act 317 of 1978 approved November 26, 1978. The successful Bidder will be required to furnish a Performance Bond and a Payment Bond each in the full amount of the Contract Price. PREVAILING WAGES: Attention is called to the fact that payment of Davis-Bacon prevailing wages will be required and have been included in the documents. Owner reserves the right to reject any and all bids, to waive any and all informalities and the right to reject all nonconforming, non-responsive or conditional bids, in the Owner's sole discretion. Intersection Improvements for Airport Drive, Olmsted Drive, and Third Street. Work is divided into Parts A and B. Part A-This work includes site work, excavation, utilities, drainage, grading, and preparation of aggregate base. Part B - This work includes paving, marking, signage, sidewalks, topsoil, and seeding.

Bid Results

Roads / Highways

$4,249,380.00

Public - City

Outdoor Lighting, Paving, Site Work

72

16

39

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
109
Bidding Soon
1,634
All Active Projects
775
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2022

January 2, 2023

img_map_placeholder

1 Terminal Dr, Middletown, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Intersection Improvements - Airport Drive, Olmsted Drive, and 3rd Street

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.