BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 25, 2023 at 7:00 PM

Updated January 26, 2024

Demolition, site work and new construction of a municipal facility in Sequim, Washington. Completed plans call for the demolition of a municipal facility; for the construction of a municipal facility; and for site work for a 62,100-square-foot municipal facility.

Provide all labor, material, equipment, and permits to demolish the existing hatchery and build a new hatchery with all required infrastructure above the flood plain at the Departments Hurd Creek Hatchery, located at 955 Fasola Road Sequim Washington, Washington, 98382 in Clallam County. Work includes: Demolition of designated structures on the existing hatchery site, relocating designated existing ponds, restoring the existing site; construction of a distribution box, raceways, hatchery building, piping and infrastructure for both new and relocated structures. For information or technical questions regarding this project, email CAMP.Bids@dfw.wa.gov with the project title and project number in subject line. This email may also be used to request copies of the projects posted documents (Drawings, Specifications, Addenda). Minority and Women's Business Enterprises (MWBE) are encouraged to participate in the bidding as prime contractors, subcontractors, or suppliers. THE PROPOSED HATCHERY RELOCATION IS NEEDED TO MOVE HATCHERY OPERATIONAL FACILITIES ABOVE THE FLOODPLAIN. PROJECT AREA: 62,100 SQ. FT. Engineers Estimate: $9,000,000 The Owner will NOT answer questions received after 2:00 p.m. on October 27, 2022. Due to this threat the scope of this project is to move the hatchery above the flood plain. This shall include construction of a new hatchery building, 10x100 raceways, distribution tower, UV system, office building and water re-use systems. This shall also include all infrastructure and site work required to install fiberglass round ponds and raceways. This shall also include the demolition and removal of the existing hatchery infrastructure including the existing hatchery building and pond structures located on the existing hatchery location. No demolition can occur until the new hatchery site is operational. All transfer of water supplies shall be coordinated to keep the existing hatchery functional throughout the transition. The proposed hatchery relocation is needed to move hatchery operational facilities above the floodplain.

Award

Municipal

$8,092,000.00

Public - State/Provincial

Demolition, New Construction, Site Work

237

37

55

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
227
Active Projects
125
Bidding Soon
2,238
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2022

February 13, 2023

Project location map

955 Fasola Rd, Sequim, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.