BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 7, 2022 at 7:00 PM

Updated January 25, 2024

Site work for a civil project in North Kingstown, Rhode Island. Completed plans call for site work for a road / highway; and water / sewer project.

This project consists of retrofit improvements to five (5) existing stormwater detention basins at various locations along Route 4, Route 403 and I-95. The proposed retrofit improvements include installation of pretreatment practices, new or modified out control structures, basin excavation and fill, limited liner removal and maintenance improvements to modify the systems to meet the latest design guidance. Modifications to basin geometry and water surface elevation through excavation/fill or meditation to outlet elevation, are typical to create specific ponding conditions and promote emergent plant life for biological treatment process. Other work items include the construction of maintenance access roads, cleaning of catch basins and pipes and installation and maintenance of erosion control devices. Project Locations: - Route 4, Route 403, I-95 East Greenwich, Rhode Island North Kingstown, Rhode Island Warwick, Rhode Island RI DOT - Drainage Ponds Rehabilitation C-1 Bid Bond: 5% Performance Bond: 100% Payment Bond: 100% Completion Date: June 15, 2024 Liquidated Damages: $2,700 per calendar day.

Post-Bid

Water / Sewer

$300,000.00

Public - State/Provincial

Site Work

131

33

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
624
Active Projects
342
Bidding Soon
4,309
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2022

April 15, 2023

Project location map

Multiple Locations, North Kingstown, RI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.