BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

This is a service / maintenance or supply contract in Springfield, Missouri. Contact the soliciting agency for additional information.

1. Size: 1 Inch Ips Sdr 9 2. Shall Meet the Requirements of the Latest Revision of Awwa C901/c906, Astm D2239, Astm D2737, Astm D3035, Astm F714 and Nsf Standard 61 Where Applicable. 3. Shall Be Labeled With Blue or White Lettering Containing at a Minimum the Manufacturers Name, Nominal Pipe Size, Sdr, Type of Material, Month and Year of Manufacture and the Plant Location Code. All Pipe to Have a Minimum of 3 Longitudinal Blue Stripeoriented at 120 From Each Other. 4. Must Meet or Exceed Cell Classification 445574c Cc3 Per Astm D3350. 5. Pipe Shall Be Supplied in 20 Feet Lengths. 6. Manufacture Date Must Be No More Than 24 Months Out Before Date of Delivery. 7. The Polyethylene Source Resin Shall Have a Ppi Tr-4 Independent Listing, and the Pipe Manufacturer Shall Maintain a Dependent Listing, Also in Conformance With Ppi Tr4. 8. All Rework, if Used, Shall Meet All Requirements of Awwa C901 or C906 Whichever is Applicable and Be Generated From the Same Manufacturing Facility as the Supplied Pipe. Rework Material Shall Not Exceed 10% of Material Used to Produce Pipe. 9. The Pe4710 Shall Be Well Processed to Maximize Homogenization to Minimize or Eliminate Un-pigmented Zones Across the Pipe Wall Cross-section. The Hdpe 4710 Pipe Shall Be Capaof Butt-fusion Across the Entire Range of Both Heater Plate Temperatures and Interfacial Pressof Astm F2620. Fused Pipe Must Be Able to Pass a Mcelroy Side Bend Test. Mandrel Curvature to Specimen Thickness to Be 2:1 (R/t=2/1). 10. Pipe Shall Be Shipped With End Caps to Prevent Contamination During Shipping and Storage.

Post-Bid

Municipal

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
25
Bidding Soon
346
All Active Projects
126
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2022

November 18, 2022

img_map_placeholder

Multiple Locations, Springfield, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.