BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 19, 2022 at 7:00 PM

Updated January 26, 2024

Site work for a golf course in Allentown, Pennsylvania. Completed plans call for site work for a golf course.

There are currently 7) 50 above grade wood utility poles at 50 on center. At 300 feet from the tee box there are 6) 75 steel poles. Wood poles: Leave the first pole as is, remove the following 6 wood poles. It is acceptable to remove 6-8 of topsoil, cut the pole below grade and backfill to original grade. Or the pole can be completely pulled out and then backfilled. Steel poles: Furnish and install 12) 100 high steel poles. Beginning 25 from the remaining 50 wood pole, the new 100 poles shall be set at 50 intervals for a span of 550. After the first 300 the pole will set in line with the existing (6) 75 poles. All new cable net and hardware shall be furnished and attached as follows. Section 1, 50 to 100 x 25 wide Sections 2-7) sections of 100 high x 50 wide. Sections 7-11) 100 high x 50 wide utilizing the now centered 75 pole. Section 12) 100 tapered down to 75 to complete the span. Poles and foundations shall be designed and built to engineers specifications and local building code. The successful bidder will furnish drawings and calculations stamped by a PA PE. This project involves the construction of 100' utility poles and netting for the Driving Range at the Allentown Municipal Golf Course, 3400 Tilghman Street, Allentown, Pa 18104. Within 24 hours of registering with Public Purchase you will receive an activation email. At this time you will be able to register with the City of Allentown. Login to Public Purchase, accept the terms and conditions of use, then start your registration process with the City of Allentown. Select Home, Tools, Agencies, and type City of Allentown. Click Register, follow the prompts. Once registered with the City, you can view and download the solicitation Questions Due Date: October 17, 2022, at 4:00 PM

Post-Bid

Golf Course

$700,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
737
Active Projects
385
Bidding Soon
4,703
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2022

November 23, 2022

Project location map

3400 Tilghman St, Allentown, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.