Renovation of a water / sewer project in Muskogee, Oklahoma. Completed plans call for the renovation of a water / sewer project.

If You Have Any Questions About This Bid or Would Like a Copy of This Bid, Please Contact the Projects Department, 301 S. Cherokee St., Muskogee, Ok (918-684-6212) or Email Awallace@muskogeeonline.org Any Questions Regarding This Bid Please Contact Jimmy Thomason at 218-220-0835. City of Muskogee Reserves the Right to Accept or Reject Any and/or Part of All Bids, and to Waive Irregularities at Its Discretion. The City of Muskogee Reserves the Right to Accept a Bid Other Than the Lowest Bid, With Justification, as Provided by the City's Purchasing Policy. A Bidder Wishing to Appeal a Bid Award Must Present a Written Appeal to the City Manager Within Five (5) Days of the Bid Opening. Each Proposal Must Be Accompanied by a Bidder's Bond or Cashier's Check Upon Any Solvent Bank or Trust Company, Payable Without Reserve to the City of Muskogee, Oklahoma, in an Amount Not Less Than Five Percent (5%) of the Total Amount of the Bid. Bid Security of the Two (2) Low Bidders Will Be Retained Until Approval of Contract and Execution of Satisfactory Bonds by the Successful Bidder, or Until Other Disposition on the Bids is Made. - Lock out and tag the power supply for the space heaters in the boiler room - Supply & Install three (3) Trane fan motors for the space heaters - Restore power, check motor rotation and operation - Remove existing piping and re-pipe the supply to the water softener back flow preventer - Supply & install piping materials and water regulatorto add make up water to the boiler loop - Pressurize new piping, leak check and set pressure regulator - Lock out power supply to multi zone AHU - Supply and install up to six (6) actuator motors for the AHU - Supply and install up to six (6) thermostats and wiring forfrom the thermostats to the actuators - wire the thermostats and actuators, power the circuits and check operation - wire the thermostats and actuators, power the circuits and check operation - Lock out the water supply to AHU 1 - Remove the piping and the existing damaged coil(s) from AHU lin the boiler room - Supply and install new Trane coil(s) for AHU 1 in the boiler room - Connect new coil(s) to the existing piping, restore the water supply, pressurize and leak check connections - Clean up and remove all debris

Award

Water / Sewer

$77,088.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
62
Bidding Soon
791
All Active Projects
344
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2022

December 9, 2022

img_map_placeholder

To Be Determined, Muskogee, OK

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.