BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a warehouse / distribution facility in Edgewood, Washington. Completed plans call for the renovation of a 2,341-square-foot warehouse / distribution facility.

The project scope includes enclosing an 36' x 60' steel framed covered play structure with 2x6 wood-framed, insulated walls and ribbed metal siding to become a storage building. Includes selective removal of existing asphalt, new concrete floor slab with thickened edge foundation, new insulated standing seam metal roof system over existing metal deck, electrical power service, lighting, heat, and security system. Site work includes paving, drainage, fencing and landscaping. The formal bid clock will be the District supplied and identified bid clock. Notice to Proceed will be issued on or about December 9, 2022 and on-site work may begin December 12, 2022 after approval of all required documents. See Section 01-1100, Summary of Work for specific completion times Electronic pdf and/or hardcopy bid documents will also be supplied to qualified general contractors (2 sets) and prime civil and electrical subcontractors (1 set) bv contacting Les Gerstmann (PSD) at (253) 841-8641. There is no deposit required for bid documents, but the District requests all documents be returned within i week after the bid to ARC Tacoma at 632 Broadway. Tacoma, WA A certified or bank cashiers check payable to the Owner or a bid bond executed by a licensed bonding company is required with each bid, in an amount equal to five (5) percent of the Base Bid. Make payable to Puya llup School District and enclose with bid. The Owner shall have the right to reject any or all bids for any reason or for no reason, to reject a bid not accompanied by required bid security or by other data required by the Bidding Documents, or to reject a bid, which is in any way incomplete or irregular Completion Schedule and Milestone Dates: 1. Contract Award: On or about December 8, 2022 (as soon as possible after receipt of bids acceptable to the Owner, Post Bid Submittals and the execution of the Contract award approval process). 2. Construction Start: December 15, 2022 3. Notification of Substantial Completion: March 1, 2023 4. Substantial Completion Date: March 8, 2023 5. Completion of Punch List Items: April 7, 2023 6. Final Completion: June 6, 2023

Post-Bid

Warehouse / Distribution

$460,000.00

Public - City

Renovation

43

32

15

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
27
Bidding Soon
682
All Active Projects
287
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2022

December 15, 2022

img_map_placeholder

2300 110th Ave E, Edgewood, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.