Published November 8, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Kingston, New York. Completed plans call for the renovation of a educational facility.

Kingston City School District invites the submission of Separate Sealed Bid Proposals to furnish materials & labor to complete the Kingston City School District Kingston High School Main AC Upgrade in accordance with the plans & specifications for , work has been assigned to the following contracts:Contract 1: General Work Contractor (GWC) Contract 2: Mechanical Work Contractor (MWC) Contract 3: Electrical Work Contractor (EWC)Any bid may be withdrawn without prejudice prior to the official bid opening time or any publicized postponement thereof.Any bid received after the time and date stated above will be returned to the bidder unopened Digital Viewing Bidders may register to view the CONTRACT DOCUMENTS, online free of charge, on our project portal thru the following two options : (a) go to Digital Download Digital Download of Project documents are available thru the project portal See #1 above) for a fee of $25.00 payable directly to the printer (Credit Cards payments are preferable); an instruction sheet for ordering the PDF Download has been included as a link within the portal CD Containing Plans and Specs - Compact disks containing the plans and specs may be purchased for $25.00 each by prospective bidders directly from the Printer (Checks or Credit Cards are Acceptable) + Shipping costs as may be necessary should be arranged with the printer and are non-refundable. additionally to avoid shipping costs full sized plans and specs as well as CD's will be available at all six (6) New York Branches of Dataflow, including Albany, Binghamton, Corning, Ithaca, Utica, and Rochester: drawings and specifications are returned, in good condition, any timeprior to 30 days of award or rejection of the Bids. Shipping costs as may be necessary should be arranged with the printer directly and are non-refundable. Drawings and specifications remain the property of the Owner and must be returned to the Printer. Additional hard bid documents will be available for purchase at actual cost of reproduction. The bid documents and contract documents may be examined at the office of BBL Construction Services, LLC, 302 Washington Ave Extension, Albany, NY 518-452-8200; KSQ Design, dba KSQ Architects, P.C, 215 West 40 th Street, New York, NY 10601 Project No. 2112505.00 *NOTE: Bid Date Has Been Changed To 11-08-22

Post-Bid

Educational

$300,000.00

Public - City

Renovation

27

13

24

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Mockups, Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Temporary Construction, Vehicular Access and Parking, Temporary Roads, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Demonstration and Training, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Roofing and Siding Panels, Siding, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Plastering, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers, Canopies, Other Specialties, Pest Control Devices
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Ducts, Central Cooling Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Low-Voltage Controllers, Enclosed Controllers, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Dies, Molds

Find More Local Projects

Within 75 Miles of This Project
415
Active Projects
256
Bidding Soon
2,886
All Active Projects
1,390
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2022

December 8, 2022

img_map_placeholder

403 Broadway, Kingston, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Kingston High School Main AC Upgrade - Contract 3 - Electrical Work Contractor (EWC)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.