Demolition, site work, renovation and addition to an educational facility in Monroe, Louisiana. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a 16,107-square-foot educational facility; and for site work for a educational facility.

Carroll High Band Building Renovations & Additions BID SECURITY equal to five percent (5%) of the Total Bid shall be in the form of a bid bond or certified check or cashier's check or prescribed by LA RS 38:2218.A must be attached to and made a part of the bid. If a bid bond is provided, it shall be on the provided form and only on the provided form. Bid Bonds must be written by a qualified company licensed to do business in Louisiana. The successful Bidder will be required to furnish a Performance and Payment bond written by a company licensed to do business in Louisiana in an amount equal to 100% of the contract amount. For this project, Liquidated Damages will apply in the amount of Five Hundred Dollars ($500) per day for each consecutive calendar day which the work is not completed, beginning with the first day beyond the established completion time of 365 days. Questions about this procedure shall be directed to Bill Land at: LAND 3 ARCHITECT INC PH: 318 - 348 - 9753 1900 Stubbs Avenue, Suite A Bill@Land3.com Monroe, Louisiana 71201-5751 No Bid may be withdrawn for a period of forty-five (45) days after actual date of the opening thereof. The Board reserves the right to reject any and all bids in accord with the Bid Law.

Award

Educational

$4,729,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework, Wood Paneling
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Exterior Insulation and Finish Systems, Roofing and Siding Panels
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows, Plastic Windows, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furnishings and Accessories, Bedroom Furnishings, Blankets, Furnishing Accessories, Clocks
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Ducts, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Electronic Air Cleaners, Self-Contained Electronic Air Cleaners, Central Heating Equipment, Fuel-Fired Heaters, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Self-Contained Air-Conditioners, Convection Heating and Cooling Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Security Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Flexible Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Sprigging, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Fuel Distribution Utilities, Natural-Gas Distribution, Natural-Gas Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
11
Bidding Soon
121
All Active Projects
68
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2022

January 26, 2023

img_map_placeholder

2939 Renwick St, Monroe, LA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Carroll High School Band Building Renovations & Additions

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.