EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 10, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Pottstown, Pennsylvania. Completed plans call for the renovation of a educational facility.

construction renovation of the Owen J. Roberts High School Library & LGI BIDS ARE INVITED ON A LUMP SUM BASIS FOR THE FOLLOWING CONTRACTS: Contract 1- General Construction Contract 2- Fire Protection Construction Contract 3-Mechanical Construction Contract 4- Electrical Construction Bidder proposals must be accompanied by either a certified check, certified bank treasurer check, bank cashier check, or bid bond in the form provided. A satisfactory corporate surety shall provide security in an amount equal to 10% of the base bid. The surety shall name as payee or obligee the Owen J. Roberts School District. Notice is hereby given that the Renovation to Owen J. Roberts High School Library and LGI, for which construction proposals are being solicited, is a Public School constituting public works and is subject to applicable provisions of the Pennsylvania Human Relations Act of October 27, 1955, P.L. 744 and the Pennsylvania Prevailing Wage Act No. 442 of August 14, 1961, as amended on August 9, 1963 and other applicable Acts. Except as provided by law (73P.S.A1602 as amended), all proposals shall be irrevocable for sixty (60) days after bid opening date, unless delayed due to required approvals of another governmental agency, sale of bonds, or the award of a grant or grants, in which case bids shall be irrevocable for one hundred twenty (120) days in compliance with Act #317 of 1978, approved November 26, 1978, and as amended November 23, 1982, and shall be accompanied by 10% bid guaranty, payable to the Owner. The Owner reserves the right to reject any or all bids and to waive any or all irregularities, mistakes, omissions or informalities relative thereto. The date and time for the submittals of questions and for the submittal of bids as set forth in the Contract Documents shall be deemed mandatory. The failure to meet all submittal dates as set forth shall constitute a defect in the bid submission, which shall be grounds for rejection of the bid as non-responsive. The failure to meet any submittal dates shall not be considered a waivable irregularity omission or informality. Prime Contractors are responsible for the cost of delivery and must provide a FedEx or UPS account number to NRI ReproMax upon submitting payment. 3. Drawings and Specifications will be made available to plan rooms In order to ensure REGISTERED BIDDERS receive addenda and bid related correspondence, requests for Bid Documents, shall include the following information: 1. UPS/FedEx shipping address 2. Telephone and fax numbers 3. Contact person 4. E-mail address for addenda E-mailed questions should be directed to: SCHRADERGROUP architecture LLC, Attn: Mark Hitchcock at mhitchcock@sgarc.com C. Should the Contractor fail to complete the work in accordance with the Contract Documents, the Contractor shall be liable to the Owner for the sum of $1,000.00 daily, assessable as liquidated damages and not as a penalty

Award

Educational

$2,882,690.00

Public - City

Renovation

43

27

29

4

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents, Spare Parts
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Plaques, Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Audio-Video Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Storm Drainage, Roof Drains, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, Air Outlets and Inlets, Diffusers, Registers, and Grilles, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Power Filters and Conditioners, Capacitors, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
337
Active Projects
215
Bidding Soon
2,641
All Active Projects
1,263
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 16, 2022

December 16, 2022

img_map_placeholder

981 Ridge Rd, Pottstown, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Renovations to: Owen J. Roberts High School Auditorium and LG

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.