BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 15, 2022 at 7:00 PM

Updated January 25, 2024

Site work and new construction of an educational facility in Stevens Point, Wisconsin. Completed plans call for the construction of a 47,000-square-foot educational facility; and for site work for a educational facility.

The Project Includes a Single Story 47,000 Square-foot New Construction of an Advanced Manufacturing, Engineering Technology, and Apprenticeship Building, Consisting of Structural Steel, Bar Joists, and Membrane Roof. Sitework Will Include All New Entrance Roads, Landscaping, and Site Lighting. The Exterior of the Building Will Be Metal Panel, Masonry, and Glazed Storefront. Bids May Be Held by the Cm for a Period Not to Exceed Sixty (60) Days From the Bid Due Date for the Purpose of Reviewing the Bids and Investigating the Qualifications of Bidders, Prior to Awarding Contracts. The Cm Shall Submit Bids for Selfperformed Work One Business Day in Advance of the Bid Due Date. The Cm Reserves the Right to Reject Any or All Bids, When, in the Opinion of the Cm, Such Action Will Serve in the Best Interest of the Owner. Bidders My Contact Cm, After the Qualification Period, for Bid Information. The Building Site May Be Examined Any Time at 5000 Coye Drive, Stevens Point, Wi 54481. VII CONSTRUCTION MILESTONS A) See attached schedule i) Early Site Work: To be reviewed and confirmed with earthwork contractor - Possibly do minor site prep or site utilities December 2022. ii) Start of Construction: On or around March, 2023 iii) Enclosure: Late Summer , 2023 iv) Finishes: Winter, Spring 2024 v) Site Work: Fall 2023 and Spring 2024 vi) Completion: May, 2024 VIII CONTRACT / BIDDING DOCUMENTS A) Advertisement for Bids, dated September 27, 2022 and October 11, 2022 B) Instructions to Bidders, dated October 11, 2022 C) J.H. Findorff & Son Inc. Bid Form, dated October 11, 2022 D) Project Plans, dated September 29, 2022 as prepared by EUA E) Project Manual, dated September 29, 2022 as prepared by EUA F) Overall Construction Schedule, dated October 11, 2022

Post-Bid

Educational

$3,000,000.00

Public - State/Provincial

New Construction, Site Work

107

31

57

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
36
Bidding Soon
439
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

March 13, 2023

Project location map

5000 Coye Dr, Stevens Point, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.