Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published January 3, 2023 at 7:00 PM
Updated October 1, 2024
Site work and paving for a road / highway in Black River Falls, Wisconsin. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
As of January 3, 2023, this project is in the conceptual phase. An engineer has been selected but not awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to July 2024. *The closed solicitation has been included below for reference: 1023-00-03: Perpetuation project to resurface 7.0 miles on IH 94, Towns of Northfield and Garfield, Jackson County from the West County Line to STH 121. Work includes replacing wings on box culvert structures C-27-20,21,14,15, and resurfacing ramps on 16 and STH 121 north ramps. 1024-02-01: Perpetuation project to resurface 6.81 miles on IH 94, Towns of Northfield, Curran, and Hixton and Village of Hixton, Jackson County from STH 121 to STH 95. Work includes replacing wings on box culvert structures C-27-17,23,and 24 and resurfacing ramps on STH 121 south ramps and portions of STH 95. Additional work on both projects includes concrete pavement repair, adjusting guardrail, replacing guardrail, replacing the beam bullnose systems, culvert work, type 1 sign replacements, and pavement marking. Work will be done under traffic utilizing single lane closures during off-peak traffic time periods Anticipated Construction Cost: $17,000,000-$19,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - NW-02 RFP Engineering - Perpetuation - Resurfacing
Conceptual
Roads / Highways
$19,999,999.00
Public - State/Provincial
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 19, 2024
I-94, Black River Falls, WI
Related To This Project
Black River Falls, WI
Bid Date: Sep 30 2022
Black River Falls, WI
--
Black River Falls, WI
Bid Date: Sep 20 2022
Black River Falls, WI
Bid Date: Feb 11 2022
Black River Falls, WI
Bid Date: May 17 2022
Black River Falls, WI
Bid Date: Mar 10 2022
Black River Falls, WI
Bid Date: May 18 2022
Black River Falls, WI
Bid Date: May 18 2022
Hartford, WI
--
Cuba City, WI
Bid Date: Nov 08 2022
Milwaukee, WI
Bid Date: Oct 27 2022
Janesville, WI
Bid Date: Nov 08 2022
La Crosse, WI
Bid Date: Oct 20 2022
Madison, WI
Bid Date: Oct 11 2022
Green Bay, WI
Bid Date: Nov 03 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.