BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 3, 2023 at 7:00 PM

Updated January 25, 2024

Site work and paving for a bridge / tunnel in Black River Falls, Wisconsin. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of January 3, 2023, this project is in the conceptual phase. An engineer has been selected but not awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to July 2024. *The closed solicitation has been included below for reference: The pavement and structures need treatment to extend their service lives. Project Name County MELROSE - BLACK RIVER FALLS Route STH 054E County 27 - Jackson County Limit ROARING CK B27076,DOUGLAS CK B27016 Perpetuation project of 0.027 miles on STH 54 for rehabilitation deck replacements of Roaring Creek Bridge (B-27-0076) and Douglas Creek Bridge (B-27-0016) in Jackson County. Other work for B-27-0016 includes roadway approaches, replace thrie beam transitions, concrete surface repair, clean and paint bearings, and deck flashing. Other work for B-27-0076 includes add concrete parapets, riprap, roadway approaches, concrete pavement approach slabs, beam guard replacements, and asphaltic flumes. Construct under full closure with detour route STH 71 to STH 27 Anticipated Construction Cost: $1,000,000-$1,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - NW-08 RFP Engineering - Perpetuation - Resurfacing ad

Conceptual

Bridges / Tunnels

$2,000,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
30
Bidding Soon
479
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2024

Project location map

WI-54, Black River Falls, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.