EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 4, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Turin, New York. Completed plans call for the renovation of a educational facility.

Bids transmitted electronically or via facsimile will not be accepted. Bid is requested for the following Prime Contract: Contract 101: Mechanical Contract As found in the Bid Form, bidders must submit a separate sealed envelope with list of names and amounts to be paid to applicable General Trades, Plumbing and/or Electrical subcontractors. The list may not be changed unless the public owner finds a legitimate construction need, including a change in specifications or costs or use of a project labour agreement (PLA), and must be open to public inspection. Contractor shall be aware of the requirement under the Wicks 2008 law reform. In lieu of shipping, Contract Documents may be obtained in person at Rotolite - Elliott Corporation upon payment of a deposit of $100 per set (deposit checks shall be made payable to South Lewis Central School District). In lieu of paper bid sets, bidders can view electronic plans and specifications online based on the specific charges established by the print house. Visit www.recplanroom.com (Click Public Jobs under the Menu Tab on the left-hand side of the plan room homepage. Once you are in the public plan room, please select the link for South Lewis Central School District. Bids shall be on the form provided in the documents, prepared in duplicate as set forth in the Instructions to Bidders and enclosed in an envelope bearing on its face the name and address of the bidder and the title of work to which the proposal relates. If submitting for more than one contract, submit each contract bid in separate envelope. Any Bidder upon returning such set-in good condition within thirty (30) days after Bid opening will be refunded the deposit. Any Bidder after thirty (30) days after Bid opening or Non-Bidder so returning such a set will not be refunded. The Board of Education hereby reserves the right to waive any informalities and reject any or all Bids or to accept the one that in its judgment will be for the best interest of the school district. A Bid Bond or Certified Check made payable to the Owner in the amount of five percent (5%) of the Bid subject to the conditions provided in the Instructions to Bidders, must be deposited by each Bidder with his Bid as a guarantee that, in the case the contract is awarded to him, he will then, ten days thereafter, execute such contract and furnish a satisfactory Performance and Payment Bond, and the Bidder shall not withdraw his Bid for a period of forty-five days after the above date of Bid opening, and to guarantee the performance of all other obligations of the Bidders as set forth in Instructions to Bidders. Attention of the Bidders is called to the requirements as to the conditions of employment and minimum wage rates to be paid under this Contract as well as to the provisions set forth in the Instruction to Bidders. Work shall be commenced and continuously and diligently prosecuted immediately after contracts have been signed. Pre-Bid walk-thru shall be scheduled by appointment by calling Richard Poniktera, Head of Buildings and Grounds at South Lewis Central School District Office (315) 348-2504.

Post-Bid

Educational

$680,000.00

Public - City

Renovation

6

9

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Layout, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
65
Bidding Soon
775
All Active Projects
389
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2022

December 5, 2022

img_map_placeholder

To Be Determined, Turin, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2022-23 CAPITAL OUTLAY PROJECT

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.