BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Mission, Texas. Completed plans call for site work for a stadium; and educational facility.

https://myrgv.com/local-news/2022/11/19/mission-cisd-sues-contractor-for-delayed-stadium-renovation/ Mission CISD sues contractor for delayed stadium renovation The Mission Consolidated Independent School District sued McAllen contractor Holchemont and subcontractor Sturdisteel last month, claiming they "fumbled the ball" with the much delayed renovation of Tom Landry Stadium. The district claims those entities' work on the project was late and defective. Holchemont conducted a more than $7 million stadium renovation in 2017, with a scope of work that included new parking, seating, ticket booths, lighting and a press box with an elevator. But assessments launched two years later, in 2019, prompted the district to pay another contractor over $1 million for more construction and to close the stadium for the 2021 season. Games returned to the stadium this season. The district's players also played their 2017 season completely on the road. "MCISD made it abundantly clear to Holchemont that the project needed to be completed before the start of the Texas high school football season," the suit says. "Holchemont failed to timely complete the project. Holchemont's failure left MCISD without a football stadium it could use for most of the Texas high school football season. MCISD suffered a loss of the benefit of its bargain when Holchemont did not timely complete the project. MCISD is entitled to liquidated damages for Holchemont's failure to timely achieve substantial completion." The suit says the district is entitled to $1,500 per day for each day after the date Holchemont was required to achieve substantial completion and did not. Work performed by Sturdisteel, the district claims, was not done correctly. The suit says bleacher supports were not aligned with concrete piers during the project, resulting in a "defective and dangerous bleacher system." "The bleacher supports themselves were warped and rusted. When MCISD complained, Sturdisteel and its counsel blithely declared the rusting bleacher supports to be nothing more than a 'cosmetic' issue," it says. "Sturdisteel failed to perform its work on the stadium in a good and workmanlike manner. The bleacher system was defective and not as warranted." The district lists a dozen complaints about improper renovations, including defective parking area work, faulty piers, obstructed facilities, and missing fasteners. The district claims Holchemont failed to correct work in compliance with the district's contract and that Sturdisteel breached its warranties. Both entities, the suit says, have conducted a site review but have not corrected construction defects. The district is suing the companies for over a million dollars in damages. _________________________ Estimated budget: MHS Tom Landry Stadium $590,000 MHS TOM LANDRY STADIUM $690,000 Independently and not as an agent of the District, the Contractor shall furnish all the necessary qualified personnel, materials, supplies, and equipment not otherwise provided by the district, and do all things necessary to provide services. Questions Due Date: Oct 24th 2022, 2:00 PM CDT (Via online portal). THE CONSTRUCTION DOCUMENTS DEPICTING THE PROJECT SCOPE The request for competitive sealed proposals that includes construction documents, selection criteria, estimated budget, project scope, schedule, and other information that contractors may need to respond to the request may be obtained from, or inspected at: Javier Hinojosa Locations Where Competitive Sealed Proposals May Be Obtained Javier Hinojosa Engineering AGC OFFICES - 416 E. Dove Avenue Harlingen, Pharr, Brownsville McAllen, Texas 78504 OTHER LOCATIONS - TEL: 956-668-1588 McGraw-Hill Construction - San Antonio, Tx FAX: Builders Exchange of Texas-San AntonioEmail: javier@javierhinojosaeng.com

Award

Arenas / Stadiums

$1,618,488.00

Public - City

Site Work

17

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
12
Bidding Soon
275
All Active Projects
117
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 27, 2022

December 26, 2022

img_map_placeholder

Multiple Locations, Mission, TX


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.