EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 26, 2023 at 7:00 PM

Updated January 25, 2024

Site work and paving for a mixed-use development in Albany, Georgia. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project will be bid on a unit price basis for all specified work and will be awarded to the lowest responsive and responsible bidder. 5% Bid Bond is required of all bidders. Bid bond must be present for bid to be read or considered. 100% Performance and Payment bonds will be required of the successful bidder. For additional information, contact Ricky Gladney, Buyer, at (229) 302-1455. Submit all questions via email to rqladney@albanyga.gov cc: jswilliams@albanyqa.gov. The deadline for guestions is November 3, 2022, at 2:30 PM. Questions received after this deadline may not be answered. Replies of substance will be in the form of written addenda and made available to all potential bidders. The scope of the work includes sawcutting and removal of broken and cracked concrete, replacement of these broken and cracked portions of the existing trail with new concrete, installation of decorative pavers in areas where they have been removed by past repairs, installation of a new ADA compliant handrail along the trail's southern end, driveway installation at Flint Avenue, and assorted other minor repairs.The work is in three locations: Monroe Street trailhead at the north end of the Connector Trail, traffic control measures in Tift Park, and repair and cleaning of the River Spur Trail at the south end of the Connector Trail. The construction of a concrete trailhead on Monroe Street is to be installed within City street right-of-way and on City owned property; the project consists of installation of a concrete parking spaces on Monroe Street and a concrete plaza area for pedestrians and cyclists using the existing Connector Trail and the future Rail-to-Trail along with associated work. The installation of timber guard rails and of bollards will be within Tift Park to control and limit vehicle access to the existing Connector Trail. The River Trail Spur extends from the southern end of the Connector Trail at Roosevelt Street southward to connect to the Riverfront Trail in the park located between the Flint River and Front Street. The existing spur trail will be cleaned, broken portions will be replaced, decorative pavers installed, and other improvements constructed. This is a unit cost contract, and the City reserves the right to adjust the quantities within the contract by increase, decrease, or elimination in order to bring the project within the funding budget.

Bid Results

Roads / Highways

$509,168.00

Public - City

Paving, Site Work

15

22

3

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Inverted Siphons
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
22
Bidding Soon
319
All Active Projects
118
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2022

December 14, 2022

img_map_placeholder

Multiple Locations, Albany, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.