Published April 15, 2024 at 8:00 PM

Updated October 1, 2024

Site work, paving and renovation of a mixed-use development in Eufaula, Oklahoma. Completed plans call for site work for a sidewalk / parking lot; for paving for a educational facility; and for the renovation of a educational facility.

SCOPE A. Remove portions of existing buildings in the following sequence: 1. Remove and store for reinstallation, gate controls, fencing and other materials as required to facilitate the removal of paving as indicated. a. Maintain Owner access as needed for operations. Coordinate removal work and closures with Owner's schedule for deliveries. 2. Remove existing pavement as indicated in civil drawings. a. Dispose of demolished and waste materials as allowed in the Pre-Construction meeting or as required by the Contract Documents. A five percent (5%) Bid Bond, fully completed Bid Form, Non-Collusion Affidavit, Business Relationship Affidavit shall be submitted with the bid. If selected to enter into a contract, the Contractor will be required to provide a 100% Payment Bond, 100% Performance Bond, 100% Maintenance Bond as well as insurance coverage as described herein. Note: This project is federally funded by a Bureau of Indian Affairs MI&R Grant through Public Law 100-297 to the Muscogee Nation of Oklahoma. The Muscogee Nation of Oklahoma is the Owner for the purposes of the Contract. The Owner may waive any formalities or reject any and all bids

Award

Sidewalks / Parking Lot

$368,140.00

Public - Federal

Paving, Renovation, Site Work

19

14

33

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Administrative Requirements, Project Management and Coordination, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Design Data, Quality Requirements, References, Definitions, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Procedures, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Specialty Placed Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Gratings
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats, Runners, Furniture
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
54
Bidding Soon
614
All Active Projects
316
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2024

April 4, 2024

img_map_placeholder

716 Swadley Dr, Eufaula, OK

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Eufaula Dormitory - Parking Lot Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.