EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 16, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a fire / police facility in Lincolnshire, Illinois. Completed plans call for the renovation of a fire / police facility.

The proposed project consists of the removal of tile carpeting in the police department offices and replacing it with a combination of rolled sheet carpet and luxury vinyl tile (LVT). All Contracts for Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12) and the Employment of Illinois Workers on Public Works Act (30 ILCS 570). The Village of Lincolnshire reserves the right to defer the acceptance of a proposal for a period not to exceed 90 calendar days after the date proposals are received and to accept or reject all proposals and to waive technicalities and to accept the proposal which best meets the needs and requirements of the municipalities as outlined in the Request for Proposals.

Award

Fire / Police

$44,948.00

Public - City

Renovation

4

9

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Use of Site, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Tiling, Flooring, Resilient Flooring, Resilient Tile Flooring, Carpeting, Sheet Carpeting
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Rugs and Mats
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
161
Bidding Soon
2,498
All Active Projects
1,171
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2022

December 1, 2022

img_map_placeholder

1 Olde Half Day Rd, Lincolnshire, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Police Department Flooring

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.