EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 4, 2023 at 7:00 PM

Updated October 1, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Highland Park, Illinois. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

Replace the bridge carrying Park Avenue West over a Ditch of the Skokie River in Highland Park. Region 1 District 1 Federal Project # 05QI(933) County(s) Lake Key Route(s) FAU 1255 Marked Route(s) PARK AVENUE WEST Section(s) 13-00122-00-BR (HIGHLAND PARK) State Job #(s) C-91-375-14 PPS #(s) 1-21532-0000 Completion Date: July 19, 2024 Plus 15 Working Days Questions not accepted as of November 08, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, October 28, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 083 - Replace the Bridge Carrying Park Avenue West The Work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the complete removal of the existing reinforced concrete deck structure on single span steel beams, constructing a new single span steel beam structure on semi-integral abutments, earth excavation, rock excavation, channel excavation, furnished excavation, porous granular embankment, trench backfill, topsoil furnish and place, sodding, stone riprap, aggregate subgrade improvement, HMA and PCC surface removals, HMA binder and surface courses, PCC driveway placement, pavement removals, combination curb and gutter removal and replacement, sidewalk removal and replacement, curb ramp removal and replacement, concrete barrier removal, pavement patching, removal of existing structures, protective shield, structure excavation, cofferdams, concrete structures, concrete superstructure, bridge deck grooving, form liner textured surface, concretes superstructure (approach slab), furnishing and erecting structural steel, reinforcement bars, bicycle railing, parapet railing, furnishing and driving piles, temporary soil retention system, pipe underdrains, steel plate beam guardrail and terminals, non-special waste disposal, mobilization, pavement markings, temporary concrete barrier, sign panels, underground conduits, handholes, full-actuated controller and cabinet, electric cable, traffic signal posts, mast arm assemblies and poles, traffic and pedestrian signal heads, temporary traffic signal installation, remove existing traffic signal equipment, relocate existing electrical system, erosion control, temporary access, detectable warnings, staining concrete structures, water main removal and reconstruction, sanitary sewer removal and reconstruction, manholes, adjustments to drainage structures, traffic control and protection, paint traffic signal equipment, accessible pedestrian signals, video detection, backflow preventers, warm mix asphalt surface course, construction layout, temporary information signing, re-optimize traffic signal system, temporary traffic signal timing, pressure connection, water mainline stop, as-built drawings as well as all other incidental and miscellaneous items of work in accordance with the Plans, Standard Specifications, and these Special Provisions.

Bid Results

Bridges / Tunnels

$5,067,778.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

147

5

7

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Erection, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Unit Paving, Paving Specialties, Pavement Markings, Irrigation, Planting, Turf and Grasses, Plugging
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Hooks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
176
Bidding Soon
2,563
All Active Projects
1,062
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2022

April 1, 2023

img_map_placeholder

Park Ave W, Highland Park, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replace the Bridge Carrying Park Avenue West

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.