BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Shipman, Illinois. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

3 bridge replacements on IL 16: 1. Over Piasa Creek, 0.2 miles west of Piasa; 2. Over Piasa Creek Tributary, 3.2 miles west of Shipman; 3. Over Piasa Creek, 3.1 miles west of Shipman. (SN 059-0001, 059-0002, 059-7039) Region 4 District 6 Federal Project # COVDYPKZ(604) County(s) Macoupin Key Route(s) FAP 325 Marked Route(s) IL 16 Section(s) (114,116)B-2,3,4 State Job #(s) C-96-022-08 PPS #(s) 6-00390-0000 6-00391-0000 Completion Date: 85 Working Days Questions not accepted as of November 08, 2022 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, October 28, 2022. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 110 - Bridge Replacements on IL 16 This work consists of removal of the existing SN 059-0001 (a 54.3' back to back single span bridge carrying IL 16 over Piasa Creek), construction of SN 059-2513 (a triple-cell precast RCBC having a 12' span and 10' rise), and associated ditch improvements. Also, work consists of removal of the existing SN 059-0002 (a 44.3' back to back single span bridge carrying IL 16 over Piasa Creek), construction of SN 059-2509 (a double-cell cast in place RCBC having a 10' span and 10' rise), and associated ditch improvements. The SN 059-7039 will remain in place as a single-cell cast in place reinforced concrete box culvert having a 12' span x 12' rise. The proposed roadway improvements include a new pavement structure across proposed culverts, removing guardrail, and the stream re-alignment at SN 059- 7039. After construction, the roadway will be 24' wide with 4' bituminous shoulders. A 10' and 8' shoulder will also be utilized for stage construction. Additional items include pavement removal, riprap, pavement marking, seeding, and miscellaneous appurtenances as shown in the plans and as specified herein

Bid Results

Bridges / Tunnels

$3,940,758.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

196

5

3

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
44
Bidding Soon
806
All Active Projects
330
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 18, 2022

December 19, 2022

img_map_placeholder

IL-16, Shipman, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.