BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 18, 2025 at 8:00 PM

Updated October 19, 2025

Renovation of a water / sewer project in Rio Rancho, New Mexico. Conceptual plans call for the renovation of a water / sewer project.

Biological Nutrient Removal or Membrane Bioreactor (MBR) Expansion at Wastewater Treatment Plant (WWTP) 2. The Stantec (MWH) masterplan report recommended rehabilitation of the WWTP 2 Bioreactors, New Headwork Facilities, and Odor Control due to age and increased flows. The rehabilitation is intended to keep the WWTP in compliance with Environmental Protection Agency (EPA) NPDES Permit requirements. Tertiary Treatment for WWTP 2 for nutrient removal was evaluated in FY2024 to determine the appropriate treatment while considering capital cost and long-term maintenance cost. EPA National Pollution Discharge Elimination System (NPDES) permit renewal will start in calendar year 2027 and is expected to be in place in 2028 (EPA NPDES 5 year permit renewal process). The permit renewal for NPDES discharge to the Rio Grande River will have a significant impact on treatment process improvements needed to meet the future discharge permit if the standards change. The project is included in the City's 2026-2031 Capital Improvement Program (CIP). As of October 18, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$25,625,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
1
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2027

Project location map

100 Industrial Park Loop NE, Rio Rancho, NM

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.