BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a civil project in Shelton, Washington. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

For Agate Beach Water System Improvements Phase 2 - Reservoir and Booster Station Alternatively, the Contractor may use the PUD drop box located outside the front office. The PUD makes no guarantee that bid packages submitted by mail will arrive prior to the bid deadline. The District may, at its sole discretion, reject any or all bid proposals submitted. The District shall not be liable for any costs incurred in connection with the preparation and submittal of any bid proposal. The District reserves the right to waive any informality in a submitted proposal. SCOPE OF WORK: Construct a new 50,000-gallon reinforced concrete reservoir with booster pump station, standby generator, site piping, site improvements, security fencing, and temporary erosion and sedimentation control. The Work shall be physically complete within 120 calendar days after the commencement date stated in the Notice to Proceed. Contractor must acknowledge receipt of any addenda (if applicable). Contractor is required to bid entirety of the Proposal. Prospective bidders are required to participate. Compliance with State & Federal Grantor Regulations Financing of the Project has been provided by Mason County Commissioners and PUD 1 through the American Rescue Plan Act (ARPA). All contractors and subcontractors are required to pay Washington State prevailing wages. Mason County PUD No. 1 is an equal opportunity employer; small, minority and women owned firms are strongly encouraged to apply. The engineering estimate for this project is projected to be between $400,000 - $500,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$998,252.00

Public - County

New Construction, Site Work

48

24

2

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
77
Bidding Soon
2,060
All Active Projects
631
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 17, 2022

January 16, 2023

May 16, 2023

img_map_placeholder

E Agate Beach Dr & E Agate Beach Pl, Shelton, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.