BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in La Porte City, Iowa. Completed plans call for the renovation of a educational facility.

The proposed project consists of the installation of new HVAC systems with fresh air ventilation for the gymnasium, auditorium, and public restroom adjacent to the auditorium. The project will also include new lighting in the gymnasium, new general house lighting in the auditorium, acoustic tile ceilings in the auditorium, renovation of the general public restrooms. Bid Type: One lump sum contract will be awarded at the appointed time and place. Plans and specifications governing construction of the proposed project have been prepared by Martin Gardner Architecture PC., Marion, Iowa as Architect. All materials and procedures shall be in strict accordance with said plans and specifications referred to and defining said proposed improvements and are hereby made a part of this Advertisement and of the proposed contract by reference, and that the contract shall be executed in compliance therewith. Document Availability: Plans and specifications and proposed contract documents may be examined at the offices of the Architect, and other locations as outlined in the Construction Documents. Rapids Reproductions will issue plans to all Contractors. All other Subcontractors and Suppliers may obtain one set of Construction Documents upon delivery of a $250 per set refundable deposit made payable to the Architect but delivered to Rapids Reproductions Cedar Rapids office. A link to the drawings and specifications are also available at the architect portal. Plans and specifications to be viewed are in Adobe .pdf format and may be downloaded and printed. Be aware that no warranty as to the compatibility of your computer software or hardware with the files provided is made. Variations between the printed files provided above by the Architect and these electronic files may exist. In the event that a conflict does exist, the printed documents issued by the Architect will take precedence over the downloaded files. Bid Forms: All bids shall be on the forms provided in the specifications for project. The provided forms of proposal shall be submitted at the time required for bids. Each bid shall be accompanied by a bid bond, certified check, cashier's check or credit union certified share draft, in a separate sealed envelope in an amount equal to five percent (5%) of the total amount of the bid. If bid bond is submitted, it must be on an approved AIA bid bond form. The certified check or cashier's check shall be drawn on a bank in Iowa or a bank chartered under the laws of the United States of America; certified share draft shall be drawn on a credit union chartered under the laws of the United States. Bid security should be made payable to the Owner as security that if awarded a contract the bidder will enter into a contract at the prices bid and furnish the required Contractor's Bonds, Certificate of Insurance, and other materials as may be required in the contract documents. The certified check, cashier's check, or certified share draft may be cashed, or the Bid Bond forfeited, and the proceeds retained as liquidated damages if the Bidder fails to execute a contract and file acceptable Certificate of Insurance within ten (10) days after the acceptance of the proposal by the Owner. No bidder may withdraw a proposal within thirty (30) days after the date set for opening bids. The successful bidder shall be required to furnish a Contractor's Performance and Labor and Material Payment Bond on an approved AIA form in an amount equal to one hundred percent (100%) of the contract price. The bonds are to be issued by responsible surety, approved by the Owner, and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for and of all materials and protect and save harmless the Owner from all claims and damages of any kind caused by the operation of the Contractor, and shall guarantee the work contracted for a period of one (1) year from the date of final acceptance of the improvements by the Owner. Sales Tax: The said project is a tax exempt project. The Owner will issue exemption certificates from the Iowa Department of Revenue, as specified in the 701 Iowa Administrative Code, Chapter 19, Rule 19.12. These certificates shall be used by the successful bidder when purchasing materials or the completion of the project. At the said time and place, the Union Community School Board will also receive and consider BIDS for said construction that were previously opened at the time and place noted below. Award of Contract: Notice is hereby given that the Owner will meet at the location and time designated above at which time and place the Owner will consider bids for said construction. Progress Payments: Payment to the Contractor will be made in monthly estimates and one final payment. Monthly estimates will be equivalent to ninety-five percent (95%) of the contract value of the work completed during the preceding calendar month. Such payments will in no way be construed as an act of acceptance for any of the work partially or totally completed. Final Payment: Final payment to Contractor will be made no earlier than forty-five (45) days from and after final acceptance of work by the Owner, subject to the contract conditions and in accordance with the provisions of Iowa Code chapters 26 and 573. Prevailing Wage: Pursuant to the requirements of the grant, Davis-Bacon wage rates are to be used on this project. Current wage rates and fringes can be found at "sam.gov". It is the Contractor and/or Subcontractor's responsibility to verify that they are using the most current rates and fringes at the time of bid opening. Submission of a bid is surety by the contractors that the most current Davis-Bacon wage determinations have been calculated for all wages and fringes. If a contractor uses wages and fringes lower than the posted amounts, it will be the contractor's responsibility to compensate laborers up to the appropriate amounts without additional compensation by the Owner. Project Construction Schedule: The work under the contract shall commence on or before the date specified in the written 'Notice of Proceed' or if lieu of the notice to proceed, the execution of the contract for construction and shall be Substantially Completed on or before August 4 th , 2023 and fully completed and ready for acceptance no later than August 18 th , 2023. Iowa Preference: By virtue of statutory authority, preference will be given to products and provisions grown and produced within the State of Iowa and to Iowa domestic labor. The Owner hereby reserves the right to reject any or all bids and to waive informalities and irregularities and to accept the lowest responsive and responsible bid.

Award

Educational

$394,000.00

Public - City

Renovation

25

12

2

9

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
37
Bidding Soon
836
All Active Projects
261
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 15, 2022

December 15, 2022

August 18, 2023

img_map_placeholder

200 Adams St, La Porte City, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.