Site work and paving for a civil project in New Braunfels, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

New Braunfels Utilities ("NBU") invites the submittal of responses to this Request for Proposals ("RFP") from qualified firms interested in providing construction services in connection with the construction of the NBU Trinity Wellfield Expansion Site Improvements Project. The Project is anticipated to include some or all of the following items within its scope: (i) the construction of wellhead and site improvements for four new groundwater wells in the Trinity Aquifer; (ii) raw water piping and appurtenances to transport water to the existing Trinity Membrane Treatment Plant; (iii) flush piping from wellhead discharge to a flush basin with outfall protection; (iv) roadway grading and construction from existing roadways to new well sites; (v) final site and surface restoration; (vi) electrical, instrumentation and controls for the four new wells; and (vii) all other appurtenances necessary to complete the Project. The Project will take place at the undeveloped parcel northwest of the existing NBU Trinity Membrane Treatment Plant at 3295 Westpointe Drive, New Braunfels, Texas 78130. This contract is contingent upon release of funds from the Texas Water Development Board ("TWDB"). Any contract or contracts awarded under this Invitation for Bids are expected to be funded in part by financial assistance from the TWDB. Neither the U.S. Environmental Protection Agency ("EPA") or the State of Texas, nor any of its departments, agencies, or employees are or will be a party to this Invitation for Bids or any resulting contract. Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel ("AIS") requirements of Section 608 of the Federal Water Pollution Control Act (33 U.S.C. 1388). Equal Opportunity in Employment - All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability or genetic information. Bidders on this work will be required to comply with the Department of Labor regulations at 41 CFR Part 60-4, relating to Construction Contractors-- Affirmative Action Requirements, which include the President's Executive Order No. 11246, as amended by Executive Order 11375 and Executive Order No. 13672, in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance. An optional pre-proposal conference for all interested parties will be held at the NBU Service Center Training Room, 355 FM 306, New Braunfels, Texas 78130 on October 27, 2022 at 1:00PM CST. It is highly recommended that all offerors interested in submitting a proposal for this work attend at this meeting. NBU will conduct site visits immediately following this meeting. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability or genetic information. Bidders on this work will be required to comply with the Department of Labor regulations at 41 CFR Part 60-4, relating to Construction Contractors-- Affirmative Action Requirements, which include the President's Executive Order No. 11246, as amended by Executive Order 11375 and Executive Order No. 13672, in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance. NBU may reject, at NBU's discretion, any and all responses that do not comply with the requirements of this CSP. Davis-Bacon prevailing wage requirements apply to the construction, alteration or repair of treatment works carried out, in whole or in part, with assistance made available by the Drinking Water State Revolving Fund ("DWSRF"). Davis-Bacon prevailing wage requirements apply to the Contractors and Subcontractors performing on federally funded or assisted contracts in excess of $2,000 for the construction, alteration or repair (including painting) of a treatment works project under the DWSRF. The estimated maximum construction budget is approximately $4,500,000. 4:00 P.M. CST, February 23, 2023. - Questions regarding this RFP or the services requested must be sent to the Purchasing Manager at purchasing@nbutexas.com. The Work includes, but is not limited to, the following: 1. Installation of above ground appurtenances, instrumentation, and raw water piping from groundwater wells to the existing Trinity Membrane Treatment Plant; and 2. Furnishing of electrical service and control equipment from the existing Trinity Membrane Treatment Plant to the groundwater wells.

Post-Bid

Water / Sewer

$4,500,000.00

Public - City

Paving, Site Work

69

25

17

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Multiple Contract Summary, Summary of Contracts, Work Restrictions, Coordination with Occupants, Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Progress Payment Procedures, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Special Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Temporary Lighting, Temporary Water, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Temporary Roads, Temporary Barriers and Enclosures, Temporary Barricades, Temporary Fencing, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Installation, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Site Maintenance, Starting and Adjusting, Checkout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Extra Stock Materials, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing, Site Remediation, Chemical Decontamination
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Concrete Finishing, Concrete Curing, Grouting
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Flooring, Carpeting, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Parking Key and Card Control Units, Educational and Scientific Equipment, Laboratory Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Identification for Electrical Systems, Overcurrent Protective Device Coordination Study, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Communications Services
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Rodent Control, Soil Stabilization, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Flexible Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Gas and Vapor Process Piping, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Lifts, Slings, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors, Trucks, Dump Trucks, Tank Trucks
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
60
Bidding Soon
2,352
All Active Projects
847
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2023

May 15, 2023

img_map_placeholder

3295 Westpointe Dr, New Braunfels, TX


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Trinity Wellfield Expansion Project -Site Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.