EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 5, 2023 at 7:00 PM

Updated October 1, 2024

Site work and new construction of a mixed-use development in New Holland, Pennsylvania. Completed plans call for the construction of a parking garage; for site work for a parking garage; service station / car wash facility; and service station / car wash facility.

The Project consists of selective demolition of the existing fuel island that includes concrete fuel island, steel bollards (that are also supports for the existing lighting), fuel station dispenser pumps and associated piping, controls, etc. and underground fuel piping from existing tank locations. Remove and dispose of existing fuel pump controls and associated wiring systems and protective bollards. In addition, demolition and disposal of existing underground 10,000 gallon diesel tank and 1,000 gallon gasoline tank. Tank alarm system, fuel oil tank vents, pads manholes, ports to also be removed. Existing paving will need to be removed to install the new systems. Fuel System Construction Contract 3610-2: The Plumbing Contract includes the furnishing and installation of all plumbing equipment, accessories and piping systems, plus other construction operations traditionally recognized as Plumbing Construction. Work under this prime contract includes, but is not limited to, the following: a. All Fuel System/Mechanical Construction work indicated on drawings M1.1, M2.1, M2.2 and M3.1 and as follows: i. Demolition and disposal of existing underground 10,000 gallon diesel tank and 1,000 gallon gasoline tank and related equipment (pads, manholes, ports, tank alarm system, fuel oil tank vents, etc. in their entirety. ii. Demolition and disposal of existing underground fuel lines from the tanks to the existing fuel island. iii. Demolition and disposal of existing concrete fuel island, dispenser pumps and associated piping, controls, etc. iv. Demolition and disposal of existing fuel pump controls and associated wiring systems, bollards and lighting, and emergency shutdown system. v. Furnish and install new Diesel and Gasoline dispensers and related equipment at fuel island along with bollard protection for fuel island. vi. Furnish and install new above ground 10,000 gallon diesel and gasoline tanks, fill ports and other equipment required for a complete installation. vii. Furnish and install new reinforced concrete pad for fuel tanks and bollard protection. viii. Furnish and install underground fuel piping from fuel tanks to dispensers at the fuel island and all final connections. ix. Furnish and install light fixtures and wiring for canopy. Bids received after the referenced date and time shall be returned to the Bidder unopened. Separate, sealed Bids will be received for the following Prime Contracts: 3610-1 General Construction 3610-2 Fuel System Construction. The following information shall be furnished by bidders when obtaining bidding documents: 1. Bidder s mailing address 2. Name of Bidder s representative 3. Bidder s telephone number 4. Bidder s facsimile number 5. Bidder s email address (email address used to submit the .pdfs) 6. Bidding documents requested, by Contract and Contract number Bidding document questions shall be directed to Crabtree, Rohrbaugh &Associates, Attention: Bidding Department, email: bidding@cra-architects.com. All questions pertaining to the Contract Documents, technical sections, legal documents, and bid submission shall be directed in writing to: John Pryor, Project Manager, email: jpryor@cra-architects.com. Each bid shall be accompanied by bid security in an amount equal to ten percent (10%) of the Base Bid amount and all alternate bid amounts in the form of a Bid Bond as described in the Supplementary Instructions to Bidders. A Performance Bond and a Payment Bond in the forms provided in the Project Manual, each in an amount equal to one hundred percent (100%) of the amount of the Contract, and each with satisfactory corporate surety, must be furnished by the successful Bidder prior to execution of a Contract. Bids may not be modified, withdrawn or cancelled by the Bidder for sixty (60) calendar days following the actual date of opening thereof, except as provided by the Commonwealth Procurement Code. However, if award of Contract is delayed by the required approval of another government agency, the sale of bonds or the award of a grant or grants, Bids may not be withdrawn by the Bidder for a period not to exceed 120 days from the date of bid opening in accordance with Pennsylvania law. Eastern Lancaster County School District reserves the right in its sole discretion to reject any or all Bids and to waive irregularities in any Bid. Further, Eastern Lancaster County School District reserves the right to award any combination of Alternates, or no Alternates, which in its sole discretion, serves the best interests of the School District. This project is subject to the Commonwealth of Pennsylvania, Department of Labor and Industry s Prevailing Wage Pre-Determination. Corporations seeking to bid which are organized under the laws of a State other than Pennsylvania must secure the appropriate certificate, authorizing them to conduct business within the Commonwealth.

Bid Results

Service Station / Car Wash

$277,772.00

Public - County

New Construction, Site Work

17

24

10

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Mockups, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Roofing and Siding Panels, Composite Roof Panels, Composite Wall Panels
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Flooring, Resilient Flooring, Wall Finishes, Stone Facing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Vehicle Service Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Systems, Facility Fuel Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Instrumentation and Control for Electrical Systems, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Surveillance
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
286
Active Projects
148
Bidding Soon
2,345
All Active Projects
1,111
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2022

December 8, 2022

img_map_placeholder

154 Eastern School Rd, New Holland, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

New Fueling Station For ELANCO Bus Garage

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.