EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 28, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Whittier, California. Completed plans call for the renovation of a educational facility.

East Whittier Middle School Gym HVAC Project NOTICE IS HEREBY GIVEN that the DISTRICT, acting by and through its Governing Board, will receive, up to, but not later than, the below-stated time, sealed bids for the award of Contracts for the below referenced services. The East Whittier City School District seeks experienced CONTRACTING firms to respond to the DISTRICT S Request for BID PROPOSALS for the purpose of providing contracting services, using a Prime delivery method for the East Whittier Middle School Gym HVAC Project located at 14421 Whittier Blvd, Whittier, CA 90605 Each Bidder for Middle School Gym HVAC Projects, shall be a licensed Mechanical/HVAC contractor pursuant to the California Business and Professions Code, must possess a valid Class C-20 License or equivalent at the time of bid and throughout the duration of this Contract. The Contractor s California State License number shall be clearly stated on the bidder s proposal. The successful bidders must be registered with the State Department of Industrial Relations and have the appropriate, current California contractor s license, as indicated above, for the scope included in the bid, prior to submitting a bid . Pre-Bid RFI Deadline: October 27, 2022 @ 10:00 AM Project Scope: The installation of new HVAC systems inside Middle School Gymnasium buildings. All bids must be hand delivered to the Facilities Office, noted above, at which time they will be time stamped. Bids left at the reception desk of the District s Main Office or delivered anywhere other than the Facilities Office shall be considered undelivered". Trade Contractor bids shall be submitted in a sealed envelope, identifying the Project and Bid Number. Any bid received after the time indicated will be returned unopened. East Whittier City SD reserves the right to postpone the date and time for submission of Bid. The successful bidder shall commence work with the issuance of the Notice to Proceed and complete all work within the time period and milestones from the official start date as illustrated in the Bidding Documents. The East Whittier City SD has established a liquidated damage rate of $2,000 per calendar day for each and every calendar day that the work remains uncompleted or unaccepted by the District. Bid must conform to the requirements of the Contract Documents. The DISTRICT reserves the right to reject any and all proposals or to waive any irregularities or informalities in any proposal or in the Bidding process. No Bidder may withdraw any bid for a period of five (5) days after the date set for the opening of bids. Potential applicant firms are directed NOT to make personal contact with any member of the East Whittier City School District Board of Education. Failure to abide with this requirement will result in the offending proposer s proposal either being disqualified or terminated if discovered after receiving Board approval. If you have any questions, please contact Kristopher Bean with EWCSD at kbean@ewcsd.org

Award

Educational

$1,037,838.00

Public - City

Renovation

44

30

2

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Membrane Roofing, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Wood Flooring, Carpeting, Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Commissioning of Electrical Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Fill
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
294
Active Projects
139
Bidding Soon
2,383
All Active Projects
1,027
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2022

December 15, 2022

img_map_placeholder

14421 Whittier Blvd, Whittier, CA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

East Whittier Middle School Gym HVAC Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.