Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in North Bend, Washington. Working plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; 13-space sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
SPECIAL NOTICE POSTING FOR PRE-BID SITE VISIT This is notification specifically for a site visit for a future project due to winter weather that may not allow for said visit during the solicitation period. The anticipated period of performance is June 2023 - November 2023. Project Description: This project will add over 100 new parking spaces and a connector road at the popular Denny Creek/Franklin Falls recreation area. The road will connect the new parking lot with the existing parking lot and create a user-friendly vehicle loop in this often-congested recreation area. The project site is located approximately 17 miles east of North Bend, WA off Interstate 90 near Snoqualmie Pass, WA. The project is anticipated to cost between 2 million to 3 million dollars. Project Elements: The project is expected to include construction of the following elements: approximately 800 ft of one-way road with standard asphalt includes 13 angled roadside parking stalls two pervious asphalt parking lots 57 stalls and 33 stalls approximately 800-ft of gravel connecting trails a double vault concrete toilet one information kiosk two ADA parking stalls road signage installation and striping/painting drainage work and culvert installations Rock drilling may be involved Project Location: The project is located on the Snoqualmie Ranger District in King County, Washington. From Exit 47 on I-90, go to the north side of the freeway, turn right at the 'T' intersection, go about 500' and turn left on to Road #58 just after the underpass. Then take FS Road #58 for 2.5 miles east and north to the project site. GPS coordinates are Latitude: 47.4151035784 and Longitude: -121.443289887. The approximate elevation is 2300 feet. Site Visit: November 9, 2022 at 10 a.m. PST. Denny Creek trailhead parking lot. Attendance at this site visit is not a requirement to bid but is highly recommended. Solicitation posting anticipated: End of January 2023 Technical Contact: Claribel Orellana claribel.orellana@usda.gov Secondary Technical Contact: Alex Weinberg alex.weinberg@usda.gov The method of contractor selection has not been determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Sidewalks / Parking Lot
$3,000,000.00
Public - Federal
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2023
FS 5830,, North Bend, WA
Related To This Project
North Bend, WA
--
North Bend, WA
Bid Date: Mar 17 2022
North Bend, WA
--
North Bend, WA
Bid Date: Mar 17 2022
North Bend, WA
Bid Date: Apr 21 2022
North Bend, WA
Bid Date: May 24 2022
North Bend, WA
--
North Bend, WA
Bid Date: Jun 01 2022
Bellevue, WA
Bid Date: Nov 10 2022
East Wenatchee, WA
Bid Date: Nov 02 2022
Uniontown, WA
Bid Date: Jan 31 2023
RFQ Construction Manager - GC/CM Services for Evergreen Elementary Renovation and Addition - 4852769
Spanaway, WA
Bid Date: Oct 13 2022
Nespelem, WA
Bid Date: Oct 19 2022
Pasco, WA
Bid Date: Nov 01 2022
Port Townsend, WA
Bid Date: Oct 19 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.