Published December 13, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Fulton, New York. Completed plans call for the renovation of a 213,965-square-foot, two-story above grade educational facility.

The Fulton City School District invites sealed bids, in duplicate, for: Plumbing Construction - PC2C For: 2019 Capital Improvement Project - Phase 2C District Wide Capital Improvements at the G. Ray Bodley High School Volney Elementary School Fairgrieve Elementary School Lanigan Elementary School Granby Elementary School Each Bidder must deposit with its Bid, security in an amount and form subject to the conditions provided in the Contract Documents. Withdrawal of Bids will be subject to the conditions provided in the Instructions to Bidders. Requests for interpretation, information or clarification (RFI) of the Contract Documents must be made in writing. Responses to RFIs will not be made over the telephone. Responses to RFIs will be advisory only and will not modify the Contract Documents. The Contract Documents stand as published except as modified by written Addenda before bid and Modifications after execution of the Agreement. RFIs may be emailed simultaneously to both: Mr. Michael James King + King Architects LLP 358 W. Jefferson Street Syracuse, New York 13202 Mr. Robert Marketta LeChase Construction 609 Erie Boulevard West Syracuse, New York 13204 (315) 418-6400 or e-mailed to Mr. James' attention at mjames@kingarch.com AND e-mailed to Mr. Marketta's attention at robert.marketta@lechase.com Deadline for RFI's is Tuesday, November 8, 2022. Checks for deposit for Contract Documents shall be made payable to Fulton City School District. Cash will not be accepted as a deposit. Prospective Bidders will be issued a maximum of two (2) sets each. Subcontractors, Material Suppliers, etc., will be issued a maximum of one (l) set each. Contract documents will be delivered via UPS Ground service upon request and receipt of an additional non-refundable delivery and handling charge of $40 per set, payable by separate check to Plan and Print Systems, Inc. All requests for delivery to locations outside of Upstate NY will incur an additional shipping charge based on the metering increase for those locations. Upon returning sets promptly and in re-usable condition to Plan and Print Systems, Inc. within 30 days after the date of the Bid opening, deposits will be refunded as follows: l. Any Bidder will be refunded his or her deposit in full. 2. All other persons receiving any or all the Contract Documents, including Subcontractors and Material Suppliers, will be refunded their deposit in full. All Contract Documents received (except for Documents held by Successful Bidders) must be returned to Plan and Print Systems, Inc. For Contract Documents which are not returned to the printer within this 30-day period, deposits will NOT be refunded The Owner reserves the right to waive any informality in or to reject any or all Bids. Bid Result GENERAL CONSTRUCTION - PAC - $810,000 ELECTRICAL CONSTRUCTION - BILLITIER ELECTRIC - $515,000 PLUMBING CONSTRUCTION - J&A MECHANICAL- $406,898 MECHANICAL CONSTRUCTION - KING & KING MECHANICAL - $2,970,599 SITE CONSTRUCTION - WD MALONE - $848,000

Award

Educational

$4,724,898.00

Public - State/Provincial

Renovation

145

23

18

14

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Warranties, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Site Remediation, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Lead Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Roof and Wall Specialties and Accessories, Roof Accessories, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Access Doors and Panels, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Wall Coverings, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Countertops, Furniture, Seating
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools, Integrated Construction
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Elevator Equipment and Controls, Elevator Equipment, Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Heating Equipment, Heat Exchangers for HVAC, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Air Coils, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Controllers, Variable-Frequency Motor Controllers, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Stabilization
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Watering, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting, Turf and Grasses, Seeding, Sodding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Hooks, Slings, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
97
Bidding Soon
1,097
All Active Projects
511
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2022

December 15, 2022

img_map_placeholder

Multiple Locations, Fulton, NY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2019 Capital Improvement Project - Phase 2C

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.