Site work for a mixed-use development in Saint Joseph, Missouri. Completed plans call for site work for a communication facility; and educational facility.

The Purchasing Department will accept sealed bids for FB23-053 Underground Cabling to Spring Sports Complex. A 5% bid bond in the amount of your bid is a requirement payable to MWSU. This project falls under the Missouri Prevailing Wage Rate Requirements. We reserve the right to accept or reject any or all bids. MWSU is an Equal Employment and Educational Opportunity Institution. Question Deadline10/26/2022 at 12:00 PM Questions and/or requests for clarification of this FB should be submitted via email to the Purchasing Manager, Kelly Sloan at purchase@missouriwestern.edu. Summary Missouri Western State University (MWSU) requests bids for the installation and certification of an appropriate underground pathway and cabling to support data networking requirements at the Spring Sports Complex per the following specifications. This includes installation of underground pathways for, and installation of, fiberoptic cable for the Beshears Hall residence hall to two press-box locations at the Spring Sports Complex. This also includes the installation of underground pathways, copper data cable, and mounting poles from each press-box location to an outfield camera location at each field. Refer to attached map for locations and suggested conduit paths. Scope and Specifications - Fiberoptic Cable and Pathway 1. Provide and install 1 1/4 " (min.) HDPE underground conduit from Beshears Hall south-side wiring closet to baseball and softball press-box buildings. Installer may tie into existing underground conduit outside Beshears Hall using a handhole, as long as existing cabling is not damaged. 2. Provide and install an appropriate number of 24x36x36 underground handholes along the conduit route. Handholes are required near entrances to Beshears Hall and each press-box building. A handhole is also required near the entrance to the Missouri Conservation office building for future connections. Handholes are to be placed approximately 500' apart along the route. 3. Provide and install #12 solid copper tracer wire in all underground conduit for future locating services. 4. Provide and install appropriate 12ct Singlemode fiber optic cable from Beshears Hall wiring closet to baseball press-box building, and from baseball press-box building to softball press-box building. Include 3' (min.) service loops at all termination locations and all handholes. 5. Provide and install new fiber housings, panels, and SC-APC fiber terminations for all fibers in Beshears Hall, baseball press-box, and softball press-box buildings. Scope and Specifications - Copper Cable, Pathway, and Mounting Poles 1. Provide and install 15' mounting pole, including concrete footing, at each designated location in outfields of baseball and softball fields for camera mounting. 2. Provide and install 1 1/4 " (min.) HDPE underground conduit between each pressbox building and associated outfield camera mounting pole. Conduit may tie into fiber optic cable conduit pathway as provided and installed above. 3. Provide and install an appropriate number of 24x36x36 underground handholes along the conduit route. A handhole is required near each mounting pole and each building entrance or conduit connection. Handholes are to be placed no further than 500' apart as necessary. 4. Provide and install #12 solid copper tracer wire in all underground conduit for future locating services. 5. Provide and install standard two (2) standard Category 6 outdoor-rated cables from each press-box to the associated outfield mounting poles. Installer shall leave enough cable length at mounting poles to reach top of pole and a 3' (min.) service loop in adjacent handhole. 6. Provide and install wall-mount 12-port Category 6 rated patch panel in each press-box building. Terminate associated cables to patch panel. (Panel eg: Tripplite part number N250-P12) 7. NOTE: Missouri Western will terminate cable at mounting poles when installing cameras

Bid Results

Communication

$169,670.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
51
Bidding Soon
727
All Active Projects
312
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2022

December 2, 2022

img_map_placeholder

4525 Downs Dr, Saint Joseph, MO

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.