BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a parking garage in Sacramento, California. Completed plans call for the renovation of a 16,967-square-foot parking garage.

As of March 31, 2023, the project has not been awarded. A timeline for award has not been confirmed. Project comprises of the removal of barriers to accessibility, including parking area, exterior route from parking area to primary entrance, the interior common route up to the highest tenant occupied floor, including the primary entrance, common circulation, elevators, building and floor common restrooms, building and floor common drinking fountains, restroom, and egress signage. License required to bid the project: B Contractor and all subcontractors shall abide by all health and safety mandates issued by federal, state, and local governments and/or public health officers as well as those issued by DGS, and worksite specific mandates. If multiple mandates exist, the Contractor and subcontractors shall abide by the most restrictive mandate. The term employee , worker , state worker or state employee in health and safety mandates includes contractor and subcontractor personnel. Costs associated with adhering to health and safety mandates are the responsibility of the Contractor. Contractor is responsible for the tracking and compliance of health and safety mandates and may be audited upon request. Contractor will require staff, and subcontracted staff, providing onsite services at state facilities to show proof of full COVID-19 vaccination to the Contractor's designee or be tested at least once per week. Contractor shall communicate compliance to the Contract Administrator prior to initiating services and as requested. Contractor will not provide proof or any other health information to DGS. The States requirements for Disabled Veteran Business Enterprise (DVBE) participation and other Contract requirements will be presented. Prime Contractors are encouraged to have their Key Administrator and DVBE office coordinator attend to receive this information and to have their questions answered. Attendance for the entire inspection is required in order for bidders to be eligible to submit a bid. Successful bidder shall furnish payment and performance bonds, each in the amount of 100 percent of the Contract price. If bidders decide to attend the bid opening, to maintain proper social distancing, the bid opening may be held in the atrium. At the public bid opening, all bids received before 2:00 P.M., November 16, 2022 will be opened and recorded onto a Preliminary Bid Tabulation. Bidders do not need to attend the bid opening as the Preliminary Bid Tabulation will be made available immediately after the bid opening is completed and it will be emailed to bidders. The term of this project is 390 calendar days. 000000000004961, 00000000001234 Major components of Project Work consist of the removal of barriers to accessibility, including parking area, exterior route from parking area to primary entrance, the interior common route up to the highest tenant occupied floor, including the primary entrance, common circulation, elevators, building and floor common restrooms, building and floor common drinking fountains, restroom, and egress signage. The Attorney General Building #030 Access Barrier Removal Project is Limited to Include Only the Removal of Architectural Barriers to Common Areas Within the Building in Accordance to California Building Code Section 11b-202.4, Exception 4. The Following Items Have Been Indentified as Non-compliant With the 2019 Cbc or 2010 Ada Standards and Correction of the Items is Included as Part of the Project Scope: Remodel of Existing Public and Employee Toilets Within the Building at Levels 1, 1m, 2, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, & 17 Removal and Installation of Accessible Public & Employee Drinking Fountains at Levels 1, 1m, 2, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, & 17 Remove & Replace Existing Signage at Locations Designated on Plans Remodel Transaction Counters on Levels 10, and 12 Through 17 Remodel of the Exterior Entry Plaza Restriping of Parking Garage Level 2-5

Bid Results

Parking Garage

$4,157,000.00

Public - State/Provincial

Renovation

103

27

2

3

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
149
Bidding Soon
2,884
All Active Projects
1,162
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 7, 2022

February 6, 2023

img_map_placeholder

1300 I St, Sacramento, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.