BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Santa Cruz, California. Working plans call for the renovation of a municipal facility.

** As of  February 6, 2023 , profect will rebid , no definite date for the rebid.**  This project is for licensed contractors with a Type C7, Low Voltage System Contractors License to coordinate and execute the removal of microwave equipment at two locations and the execution of Microwave backhaul and transport solutions to establish a new Microwave site location. The Contractor shall complete all or any designated portions of the work called for under the contract in all parts and requirements within 30 working days (except as modified in the technical specifications). The County, through General Services Department, reserves the right to reject any or all bids received as the public good may require. There are "Liquidated Damages" of $100/day for the time exceeding the successful Bidders submitted and accepted project schedule. Project scope and specifications have been prepared by Facilities Maintenance & Project Operations, a Division of General Services Department. The Hazardous Materials Reports have been prepared by Adviro. The Arborist Report has been prepared by James Allen Consulting Arborist. Each contractor shall include in their bid all labor, tools, and materials for a complete and working project for each trade component in conformance with the intent shown on any construction documents issued which may include plans, specifications, exhibits, etc. as specified herein. Bid bonds will be required for all projects over $25,000. Payment bonds will be required for every project over $25,000 and Performance bonds will be required for every project over $10,000. Prospective bidders must be fully qualified, licensed, certified, and insured to perform the work requested. All work performed must meet all current applicable laws and regulations. In accordance with SB854: 1) No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a). 2) No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. 3) This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. n. All pre-bid questions should be directed to Fred Berge at Fred.Berge@santacruzcounty.us and/or calling at (831) 454-3091 and copy to Rusty Ferguson at Rusty.Ferguson@santacruzcounty.us and/or calling at (831) 454-5365. Those copies shall be made available to any interested party upon request. The Contractor shall forfeit, as penalty, to the County of Santa Cruz, fifty dollars ($50.00) for each calendar day or portion thereof, for each workman paid less than the stipulated prevailing rates for any work done under the contract by it or by any subcontractor under it, in violation of the provisions of such Labor Code. County will be the sole judge as to the technical acceptability of any proposals and any award will be as determined most advantageous to the County considering such factors as completeness and responsiveness to Request for Proposal, experience, references, and anticipated costs. The County reserves the right to reject any or all proposals or parts thereof and to waive any informality or irregularity in any proposal. Pursuant to Santa Cruz County Code Chapter 2.33, Contractors and Subcontractors must make good faith efforts to hire Monterey Bay area residents in sufficient numbers so that no less than 50 per cent (50%) of the Contractor's total construction work force, including any subcontractor's workforce, measured in labor work hours is comprised of Monterey Bay area residents. This public works construction project is covered by Chapter 2.33 of the Santa Cruz County Code, and the entire chapter, as amended, is incorporated by reference into the project's specifications and conditions. Any bid proposal, or other response to a solicitation for bid or proposal which proposes or calls for the use of any tropical hardwood or tropical wood products in performance of the contract shall be deemed nonresponsive pursuant to County Code Section 2.37.107. LOCATION: "Virtual" Teams Meeting Bid bonds will be required for all projects over $25,000. Payment bonds will be required for every project over $25,000 and Performance bonds will be required for every project over $10,000.

Final Planning

Municipal

$155,952.00

Public - County

Renovation

4

8

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
110
Bidding Soon
2,279
All Active Projects
928
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 21, 2022

August 7, 2023

January 30, 2023

img_map_placeholder

Multiple Locations, Santa Cruz, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.