Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Boardman, Oregon. Contact the soliciting agency for additional information.
Project Description - (Supply of Materials only), (Supply of Materials, labor and Equipment) refer to bid documents and schedules for clarification. Component 1 Rail improvements Marine Drive 2 new mainline turnouts with power derail and signaling Add approximately (7) - 115# No. 11 turnouts/crossovers Add approximately 14,320 linear feet of 115# track Excavation of approximately 150,000 yards of fill Remove and replace Terminal 2 scale and scale house Component 2 - Road improvements: Ulman Blvd. Impact walls and retaining walls placed under existing Ullman Drive bridge to provide pier protection and grade control on minimum clearance alignment between UPRR mainline and POM running track. Marine Drive Marine Drive Grinding/Demolition - existing asphalt surface demolition, approximately 4,810 ft long x 26 ft wide for realignment and profile improvements. Marine Drive Subgrade Improvements - subgrade for new alignment and profile, fill compact and grade approximately 4,810 ft long x 53 ft wide for realignment and profile improvements. Marine Drive Bridge Approaches - engineered fill/earthen approaches with geofabric improvements bound by approximately 1,688ft of ecology block MSE retaining walls. Marine Drive Bridge Erection - of new pre-cast/pre-stressed concrete bridge, cast in place rails with safety fencing, approximately 123 ft long by 48 ft. wide, bearing on cast in place concrete abutments and wing walls constructed atop earthen approaches. Marine Drive Resurfacing - new 3" thick asphalt surface of new alignment/profile, approximately 4,810 ft long x 37 ft wide. Marine Drive Sidewalk / Curb / Gutter - approximately 5.5 ft wide x 11,420 ft Excavation of approximately 20,000 yard of cut, 80,000 yards of fill. Addition of heavy haul route/ construction access road to include 3 new @ grade crossing earthen ramps to navigate extra heavy and long loads around the Marine Drive bridge and Ullman A venue bridge. Component 3 - Utility Relocates: 3.1 Sewer station and line relocate/replace approximately 4,700 ft of sewer pipe 3.2 18" water main relocate/replace approximately 4,700 ft of 18" diameter water line 3.3 Natural Gas Mainline locate and add/replace casing if necessary 3.4 Electrical lines relocate/replace approximately 4,760 ft of overhead distribution lines Build: Columbia River Barge Terminal Rail Access Project Bids will not be accepted after this hour and date. Port of Morrow will be acting as the General Contractor for this project. Port of Morrow reserves the right to award or reject for good cause, any or all bids, or to postpone the award of the contract upon finding that it is in the public interest to do so. Each bid must contain a statement as to whether the bidder is a resident bidder, as defined in ORS 279a.120. The bidder is subject to all requirements regarding the payment of Prevailing Wage Rates per Public Works Project ORS 279c.800 to 279C.850.
Post-Bid
Transportation Terminals
Public - Federal
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 17, 2022
December 19, 2022
Multiple Locations, Boardman, OR
Related To This Project
Boardman, OR
Bid Date: Dec 21 2022
Boardman, OR
Bid Date: Apr 16 2021
Boardman, OR
Bid Date: Dec 21 2023
Boardman, OR
--
Boardman, OR
Bid Date: Apr 05 2022
Boardman, OR
Bid Date: May 19 2022
Boardman, OR
Bid Date: Jan 04 2023
Boardman, OR
Bid Date: Aug 25 2022
Boardman, OR
Bid Date: Jan 11 2022
Boardman, OR
Bid Date: Oct 13 2022
Talent, OR
--
Hillsboro, OR
--
Eugene, OR
Bid Date: Mar 24 2021
McMinnville, OR
Bid Date: Aug 04 2021
Tualatin, OR
Bid Date: Nov 18 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.