Published January 26, 2023 at 7:00 PM

Updated October 1, 2024

Site work and new construction of a service station / car wash facility in Mountainside, New Jersey. Completed plans call for the construction of a service station / car wash facility; and for site work for a service station / car wash facility.

As of January 6, 2023, this project has not yet been awarded. A timeline for award has not yet been established. The work shall consist of, but is not limited to: All work including submittals and any other Division 1 requirements, utilities, superstructure, finishes, MEP systems and equipment, painting, site restoration and such other construction work as may be required to render this Contract complete and ready for the use intended including warranties, guarantees and training incidental to this project as set forth in the Contract Documents, including specified Allowance Items. The Borough Council of the Borough of Mountainside (the "Borough") shall be the Owner. "Contract Documents" shall mean all of the covenants, terms and stipulations contained in the Contract, the Specifications, the Supplemental Conditions, the Technical Specifications and all supplementary documents which constitute essential parts of the Contract, including any and all other documentation which is submitted by Contractor with its Bid or subsequent thereto pursuant to the terms of the Contract Documents. All bids must be presented in sealed envelopes which are clearly marked "Bids enclosed New DPW Maintenance Garage for the Borough of Mountainside, New Jersey," attention to Martha Lopez - Borough Clerk, 1385 US Highway 22 East., Mountainside, New Jersey 07092. No bid will be received after the time and date specified. After receipt of bids, no bid may be withdrawn within sixty (60) days after the date of the bid opening except as provided herein. The bid of any Bidder who consents to an extension may be held for consideration for a longer period of time as may be agreed upon between Bidder and the Borough. Requests for Information shall be submitted to the architect in writing via email to: hfaia@aol.com, attention Donald Fiore. All RFI's will be received and responded to in accordance with the schedule outlined herein. Verbal requests will neither be acknowledged nor responded to. In addition to the above documents, a certified check, cashier's check or bid bond issued by a responsible bank, trust company or insurance company, payable to the Borough of Mountainside shall be submitted with each bid as a guaranty that if a contract is awarded the Bidder shall execute said Contract and furnish the bonds required by the Contract Documents ("Bid Security"). The Bid Security shall be in the amount of ten percent (10%) of the total amount of the bid or Twenty-Thousand Dollars ($20,000.00), whichever is lower. The bid shall be accompanied by a Certificate of Surety on the form included in the Contract Documents, from a surety company licensed to do business in the State of New Jersey, which shall represent that the surety company will provide the Contractor with the required bonds in the sums required in the Contract Documents and in a form satisfactory to the Owner's Attorney and in compliance with the requirements of law. Questions Deadline: 11/30/22 at 5:00 PM All bid security except the security of the three apparent lowest responsible bidders shall be returned within ten (10) days after the opening of the bids, Sundays and holidays excepted, unless a longer time period is agreed to by the Bidder, and the bids of the bidders whose bid security is returned shall be considered withdrawn. Any prospective bidder that wishes to challenge a bid specification shall file such challenge, in writing, with the contracting agent no less than three business days prior to the opening of the bids. Challenges filed after that time shall be considered void and having no impact on the contracting unit or the award of a contract. The selected Bidder, will, within three (3) days of award of the bid, enter into the contract attached to the bid packet with the Borough. All Bidders must comply with N.J.S.A. 10:5-31, et seq., entitled "An Act Relating to Affirmative Action in Relation to Discrimination in Connection with Certain Public Contracts and Supplementing the 'Law Against Discrimination'", N.J.A.C. 17:27, as amended from time to time; the Americans With Disability Act; where applicable, the New Jersey Prevailing Wage Act, N.J.S.A. 34:11-56.25, et seq.; the State requirement for bidders to supply statements of ownership (N.J.S.A. 52:25-24.2); the State requirement for submission of the names and addresses of subcontractors (N.J.S.A. 40A:11-16); the New Jersey Public Works Contractor Registration Act, N.J.S.A. 34:11-56.48, et seq.; and the New Jersey Business Registration Act, P.L. 2004, Chapter 57 (N.J.S.A. 52:32-44) which imposes certain requirements upon a business competing for, or entering into a contract with a public contracting agency. Bidders and their subcontractors must submit proof that at the time of the Bid they are registered with the New Jersey Department of Treasury, Division of Revenue by submitting a copy of their Business Registration Certificate prior to Contract award. This bid for services is being awarded through a "fair and open process" pursuant to N.J.S.A. 19:44A-20.4, et seq. The Owner will evaluate bids and any award will be made to the lowest responsive and responsible bidder whose bid conforms to this solicitation. The Owner reserves the right to reject any or all bids and to waive minor informalities or irregularities in bids received as permitted by the New Jersey Local Public Contracts Law (N.J.S.A. 40A: 11-1, et seq). The Borough reserves the right to reject any or all bids in accordance with the requirements of N.J.S.A. 40A:11- 13.2, and to waive immaterial informalities, or to accept any bid which, in the opinion of the Borough of Mountainside, will be in the best interest of the Borough. If the work is not completed by the scheduled Milestone completion dates, the Bidder shall pay to the Borough the sum of Five Hundred ($500.00) Dollars per day per milestone for each day that the work is not completed as liquidated damages

Post-Bid

Service Station / Car Wash

$1,100,000.00

Public - City

New Construction, Site Work

167

55

6

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Construction Progress Documentation, Scheduling of Work, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry, Stone Assemblies, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Cold-Formed Metal Framing, Metal Fabrications, Metal Stairs, Metal Ladders
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Millwork, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Sheet Waterproofing, Elastomeric Sheet Waterproofing, Thermal Protection, Exterior Insulation and Finish Systems, Steep Slope Roofing, Shingles and Shakes, Roofing and Siding Panels, Metal Roof Panels, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Panel Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Postal Specialties
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Rugs and Mats, Runners, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Elevator Equipment and Controls, Elevator Equipment, Lifts, Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Low-Voltage Distribution Equipment, Wiring Devices, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Battery Equipment, Batteries, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
563
Active Projects
325
Bidding Soon
5,353
All Active Projects
2,470
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2022

March 1, 2023

img_map_placeholder

To Be Determined, Mountainside, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

New DPW Maintenance Garage

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.