BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 11, 2023 at 7:00 PM

Updated January 25, 2024

Renovation of a municipal facility in Everett, Washington. Completed plans call for the renovation of a 117,800-square-foot, 10-story above grade municipal facility.

RFP Construction Manager - City of Everett Municipal Building - Public Works Tenant Improvement City of Everett is requesting qualifications from firms interested in providing General Contractor/Construction Manager (GC/CM) services. The alternate Public Works contracting procedure authorized in RCW 39.10.340 through 39.10.410 will be utilized for this project. Firms with previous GC/CM experience or experience using a similar alternative construction delivery format are encouraged to review the RFP requirements and submit a proposal. The selected GC/CM firm will receive direction from designated representatives of the City of Everett and will work as a member of a team to achieve project objectives. The City's project team includes representatives of the City of Everett, the Architect Mackenzie, and the GC/CM Advisor Parametrix. The City of Everett Municipal Building is a 10-story, mid-rise office building of approximately 117,800 sf and is located in downtown Everett at 2930 Wetmore Avenue, Everett, WA 98201. The building houses many of the City's Administrative and Support functions, including the Police Department, Engineering, Public Utilities, Human Resources, Permitting Services, and the Prosecutor's Office. The building was constructed in 1980 and is of concrete and steel construction with glass curtainwall and a low-slope roof system. This Project will provide modernizations and tenant improvements, primarily to the building systems, building core, and support areas that will generally include, but are not limited to: modernization of the elevator systems; HVAC equipment and controls upgrades; reroof of the building; new emergency generator and transfer switch; and modernization of the lobby, corridor, and support spaces on multiple, occupied floors which will include: modernization of restrooms; replacement of lighting and lighting controls; replacement of HVAC systems on all floors; replacement of door/frame assemblies and hardware; replacement of floor finishes; replacement of suspended ceiling panels; and interior painting and interior finish upgrades

Post-Bid

Municipal

$20,000,000.00

Public - City

Renovation

8

4

6

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2023

March 1, 2024

Project location map

2930 Wetmore Ave, Everett, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.